Do you have any question about this error?
Message type: E = Error
Message class: PPEFLO - Messages for iPPE Application Object FLO
Message number: 106
Message text: &1 between &2 and &3 is not possible
The hierarchy relationship is not possible for this element of the line
structure.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
PPEFLO106
- &1 between &2 and &3 is not possible ?The SAP error message PPEFLO106 typically indicates that there is an issue with the planning process in the SAP system, specifically related to the planning of production or materials. The message usually states that a certain operation or planning activity cannot be performed between two specified dates or periods.
Cause:
Date Range Issues: The error often arises when the specified date range for planning is not valid. This could be due to:
- The start date is after the end date.
- The dates fall outside of the planning horizon defined in the system.
- The dates are not aligned with the production calendar.
Configuration Issues: There may be configuration settings in the planning parameters that restrict planning activities for the specified period.
Master Data Issues: The master data for the materials or production resources may not be set up correctly, leading to restrictions on planning.
Locking Issues: Another user or process may have locked the planning object, preventing changes during that time frame.
Solution:
Check Date Range: Verify the dates specified in the planning transaction. Ensure that the start date is before the end date and that both dates fall within the allowed planning horizon.
Review Planning Parameters: Check the configuration settings in the planning parameters to ensure that they allow for planning in the specified period.
Examine Master Data: Review the master data for the materials or production resources involved. Ensure that all necessary data is correctly maintained and that there are no restrictions on planning.
Check for Locks: Investigate if there are any locks on the planning object. You can use transaction codes like SM12 to check for locks and resolve them if necessary.
Consult Documentation: Refer to SAP documentation or help resources for specific details related to the error message and any additional troubleshooting steps.
Contact Support: If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with SAP experts for further assistance.
Related Information:
By following these steps, you should be able to identify the cause of the PPEFLO106 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
PPEFLO105
&1 &2 will be deleted when you save
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPEFLO104
&1 &2 will be changed when you save
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPEFLO107
&1 between &2 and &3 is not possible
What causes this issue? The relationship is not possible for this element of the line structure, because the elements are not assigned to the same hi...
PPEFLO108
&1 &2 is already assigned to &3 &4
What causes this issue? &V1& &V2& already has &V3& &V4& as a higher-level node. You cannot assign this node to anothe...
Click on this link to search all SAP messages.