How To Fix PPEENGBAPI771 - Deletion of &1 between &2 and &3 with change status &4 was transferred


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPEENGBAPI - Messages for BAPIs in iPPE (Not Application-Specific)

  • Message number: 771

  • Message text: Deletion of &1 between &2 and &3 with change status &4 was transferred

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPEENGBAPI771 - Deletion of &1 between &2 and &3 with change status &4 was transferred ?

    The SAP error message PPEENGBAPI771 typically relates to issues encountered during the processing of engineering change management (ECM) in SAP, particularly when dealing with the deletion of engineering change documents or related objects. Here’s a breakdown of the components of the error message and potential solutions:

    Cause

    The error message indicates that there is an attempt to delete an object (like a material or a document) that is currently in a change status that does not allow for deletion. The placeholders in the message represent:

    • &1: The object being deleted (e.g., a material or document).
    • &2: The start date of the change.
    • &3: The end date of the change.
    • &4: The current change status of the object.

    This error typically occurs when:

    • The object is locked or in use by another process.
    • The change status of the object does not permit deletion (e.g., it may be in a status that requires it to be active or approved).
    • There are dependencies or references to the object that prevent its deletion.

    Solution

    To resolve this error, consider the following steps:

    1. Check Change Status: Verify the change status of the object. Ensure that it is in a status that allows for deletion. You may need to change the status to one that permits deletion.

    2. Review Dependencies: Check if there are any dependencies or references to the object that might be preventing its deletion. This could include:

      • Active production orders.
      • Open purchase orders or sales orders.
      • Other engineering change documents that reference the object.
    3. Unlock the Object: If the object is locked, identify the user or process that has locked it and resolve the lock. This may involve contacting the user or checking for background jobs that are using the object.

    4. Consult Documentation: Review the SAP documentation or help resources related to engineering change management for specific guidelines on the deletion process and change statuses.

    5. Use Transaction Codes: Utilize relevant transaction codes (like CC01, CC02, CC03 for change management) to manage the change documents and their statuses.

    6. Contact Support: If the issue persists, consider reaching out to your SAP support team or consulting with SAP support for further assistance.

    Related Information

    • SAP Notes: Check for any SAP Notes related to this error message for additional insights or patches that may address the issue.
    • Change Management Process: Familiarize yourself with the engineering change management process in SAP, including how statuses are managed and the implications of each status.
    • User Authorizations: Ensure that you have the necessary authorizations to perform deletions in the system.

    By following these steps, you should be able to identify the root cause of the error and take appropriate action to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant