Message type: E = Error
Message class: PPEENG - iPPE Engine Messages
Message number: 416
Message text: &1 from &2 to &3 can be edited only with a change number
You have tried to create a new relationship of type &v1& between the
objects &v2& and &v3& without specifying a change number. This is not
possible for the following reasons:
This relationship has already been maintained with change numbers.
The Customizing for type &v1& requires it to be maintained with change
numbers.
The system does not allow you to edit the relationship wthout a change
number.
Select a change number to use when editing.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
PPEENG416
- &1 from &2 to &3 can be edited only with a change number ?The SAP error message PPEENG416 indicates that a specific object (like a material or a production order) can only be edited if a change number is assigned to it. This is a common scenario in SAP when working with engineering change management (ECM) processes, particularly in the context of production planning and engineering.
Cause: The error occurs because the system is configured to require a change number for any modifications to the specified object. This is typically done to ensure that changes are tracked and managed properly, especially in environments where product changes need to be controlled and documented.
Solution: To resolve this error, you need to follow these steps: Assign a Change Number: You need to create or assign a change number to the object you are trying to edit. This can usually be done through the change management transaction in SAP (e.g., using transaction codes like CC01 for creating a change number). Once you
Get instant SAP help. Sign up for our Free Essentials Plan.
PPEENG415
&1 &2 already exists for change number &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPEENG414
&1 from &2 to &3 already exists for change number &4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPEENG417
&1 from &2 to &3 cannot be edited with a change number
What causes this issue? You have tried to edit an iPPE relationship with a change number. However, change management has not been planned for this re...
PPEENG418
&1 &2 has change statuses - change number not specified
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.