Do you have any question about this error?
Message type: E = Error
Message class: PPEENG - iPPE Engine Messages
Message number: 166
Message text: &1 &2 still has alternatives
You have tried to delete &v1& &v2&. However, &v1& &v2& still has
alternatives, which you must delete before you can delete &v1& &v2&.
The system does not allow you to delete &v1& &v2&.
Delete the alternatives before you delete &v1& &v2&.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
PPEENG166
- &1 &2 still has alternatives ?The SAP error message PPEENG166 indicates that there are still alternative components or materials associated with a particular production version or bill of material (BOM) that you are trying to process. This typically occurs in the context of production planning and engineering, where alternatives are used to provide flexibility in manufacturing processes.
Cause:
The error arises when you attempt to perform an action (like deleting or changing a production version) on a BOM or production version that still has alternative components defined. Alternatives are often used to specify different materials that can be used in production depending on availability, cost, or other factors.
Solution:
To resolve the PPEENG166 error, you can follow these steps:
Check Alternatives:
- Go to the BOM or production version in question and check for any alternative components. You can do this by navigating to the BOM in the SAP GUI and reviewing the components listed.
Remove Alternatives:
- If you find alternatives that are no longer needed, you can remove them. This can typically be done in the BOM maintenance transaction (e.g., CS02 for changing BOMs) by selecting the alternative and deleting it.
Adjust Production Version:
- If you are trying to change or delete a production version, ensure that all alternatives are either removed or that you are not trying to delete a version that is still in use.
Consult Documentation:
- Review SAP documentation or help files related to BOMs and production versions for more detailed instructions on managing alternatives.
Check Dependencies:
- Ensure that there are no other dependencies or references to the alternatives in other areas of the system that might be causing the error.
Contact Support:
- If you are unable to resolve the issue, consider reaching out to your SAP support team or consulting with an SAP expert who can provide more tailored assistance.
Related Information:
By following these steps, you should be able to resolve the PPEENG166 error and continue with your production planning activities.
Get instant SAP help. Start your 7-day free trial now.
PPEENG165
&1 &2 still has variants
What causes this issue? You have tried to delete &v1& &v2&. However, &v1& &v2& still has variants, which you must del...
PPEENG164
&1 &2 will be renamed as &3 when you save
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPEENG167
&1 &2 still has dependent iPPE objects
What causes this issue? You have tried to delete &v1& &v2&. However, &v1& &v2& still has dependent iPPE objects, whic...
PPEENG169
Descriptions of &1 of type &2 may only be &3 characters long
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.