How To Fix PPEENG166 - &1 &2 still has alternatives


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPEENG - iPPE Engine Messages

  • Message number: 166

  • Message text: &1 &2 still has alternatives

  • Show details Hide details
  • What causes this issue?

    You have tried to delete &v1& &v2&. However, &v1& &v2& still has
    alternatives, which you must delete before you can delete &v1& &v2&.

    System Response

    The system does not allow you to delete &v1& &v2&.

    How to fix this error?

    Delete the alternatives before you delete &v1& &v2&.

    Procedure for System Administrators

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPEENG166 - &1 &2 still has alternatives ?

    The SAP error message PPEENG166 indicates that there are still alternative components or materials associated with a particular production version or bill of material (BOM) that you are trying to process. This typically occurs in the context of production planning and engineering, where alternatives are used to provide flexibility in manufacturing processes.

    Cause:

    The error arises when you attempt to perform an action (like deleting or changing a production version) on a BOM or production version that still has alternative components defined. Alternatives are often used to specify different materials that can be used in production depending on availability, cost, or other factors.

    Solution:

    To resolve the PPEENG166 error, you can follow these steps:

    1. Check Alternatives:

      • Go to the BOM or production version in question and check for any alternative components. You can do this by navigating to the BOM in the SAP GUI and reviewing the components listed.
    2. Remove Alternatives:

      • If you find alternatives that are no longer needed, you can remove them. This can typically be done in the BOM maintenance transaction (e.g., CS02 for changing BOMs) by selecting the alternative and deleting it.
    3. Adjust Production Version:

      • If you are trying to change or delete a production version, ensure that all alternatives are either removed or that you are not trying to delete a version that is still in use.
    4. Consult Documentation:

      • Review SAP documentation or help files related to BOMs and production versions for more detailed instructions on managing alternatives.
    5. Check Dependencies:

      • Ensure that there are no other dependencies or references to the alternatives in other areas of the system that might be causing the error.
    6. Contact Support:

      • If you are unable to resolve the issue, consider reaching out to your SAP support team or consulting with an SAP expert who can provide more tailored assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CS01 (Create BOM), CS02 (Change BOM), and CS03 (Display BOM) to manage BOMs effectively.
    • Alternative Items: Understand how alternative items are defined in your system and the implications of using them in production planning.
    • SAP Notes: Check for any SAP Notes related to this error message for potential patches or updates that may address the issue.

    By following these steps, you should be able to resolve the PPEENG166 error and continue with your production planning activities.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author