How To Fix PPECMP313 - Checks are only supported for &1 of level (&2)


PPECMP313 - Overview

  • Message type: E = Error

  • Message class: PPECMP - Messages for iPPE CMP Application (Components)

  • Message number: 313

  • Message text: Checks are only supported for &1 of level (&2)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


PPECMP313 - Details

  • The SAP error message PPECMP313 indicates that there is an issue with the level of checks being performed in the context of a specific process or transaction. This error typically arises in the context of the SAP Project System (PS) or related modules where checks are performed on project components or structures.
    
    Cause: The error message "Checks are only supported for &1 of level (&2)" suggests that the system is trying to perform checks on a project or component that is not supported at the specified level. The placeholders &1 and &2 represent the specific type of check and the level at which the check is being attempted, respectively. This can occur due to: Incorrect Configuration: The project structure or configuration may not be set up correctly to support the checks at the specified level. Unsupported Level: The level of the project or component being checked may not be valid for the type of

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


PPECMP313 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker