Message type: E = Error
Message class: PPECHK - iPPE Consistency Check
Message number: 325
Message text: Alternative line &1 is assigned at start &2
You have modeled the production line with iPPE. In the master data, an
alternative line exists that in turn contains parallel line segments
(stations). The parallel stations do not have a reporting point at the
start, however, a reporting point exists at the start of the production
line.
This constellation can also lead to problems during confirmation. A
reporting point is inherited along the stations from the back to the
front. It can therefore be inherited at multiple parallel stations. The
reporting point relationships in this case are no longer linear. As a
result, the sequential posting cannot be executed during confirmation.
Remove the assignment of the reporting point at the start of the
alternative line.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
PPECHK325
- Alternative line &1 is assigned at start &2 ?The SAP error message PPECHK325 indicates that there is an issue with the assignment of alternative lines in a production planning context, specifically in relation to a routing or production order. The message typically means that an alternative line (or alternative operation) is already assigned to a specific start date, which is causing a conflict.
Cause: Duplicate Assignment: The alternative line (or operation) is already assigned to another production order or routing for the specified start date.
Configuration Issues: There may be configuration settings in the routing or production order that are not allowing for the alternative line to be assigned correctly. Data Integrity Issues: There could be inconsistencies in the master data or transactional data that are leading to this error.
Solution: Check Assignments: Review the routing or production order to see if the alternative line is already assigned to another operation or order for the same time period. If so, you may need to
Get instant SAP help. Sign up for our Free Essentials Plan.
PPECHK324
&1 &2 has no alternative lines
What causes this issue? No alternative lines exist for &V1& &V2&.System Response The explosion does not support any alternative line...
PPECHK322
No priority selected for alternative line &1 (&2 &3)
What causes this issue? No priority was selected for the alternative line &V1& at the assignment to the part of the line network. However, ot...
PPECHK400
************Messages for Line Balance Checks*************************
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPECHK401
&1 &2 has no valid line balance
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.