Do you have any question about this error?
Message type: E = Error
Message class: PPECHK - iPPE Consistency Check
Message number: 320
Message text: Relationships missing in the structure of &1 above the line
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PPECHK320
- Relationships missing in the structure of &1 above the line ?The SAP error message PPECHK320 indicates that there are missing relationships in the structure of a specific object (denoted by
&1
) above the line in the context of Production Planning and Execution (PP/PE). This error typically arises during the planning process when the system expects certain relationships (like dependencies between components or operations) to be defined but cannot find them.Cause:
- Missing Relationships: The primary cause of this error is that the system is unable to find the necessary relationships between the components or operations in the Bill of Materials (BOM) or routing.
- Incorrect Configuration: There may be an issue with how the BOM or routing is configured, leading to missing links or dependencies.
- Data Inconsistencies: There could be inconsistencies in the master data, such as missing or incorrect entries in the BOM or routing tables.
- Versioning Issues: If there are multiple versions of a BOM or routing, the system might be referencing an outdated or incorrect version.
Solution:
- Check BOM and Routing: Review the BOM and routing for the material in question. Ensure that all necessary components and operations are defined and that their relationships are correctly established.
- Maintain Relationships: If relationships are missing, you may need to add them manually. This can involve defining component assignments in the BOM or ensuring that operations in the routing are correctly linked.
- Use Transaction Codes: Utilize transaction codes like
CS03
(Display BOM) andCA03
(Display Routing) to inspect the details of the BOM and routing.- Consistency Check: Run consistency checks on the BOM and routing using transaction codes like
CS15
(BOM where-used list) orC223
(Routing where-used list) to identify any discrepancies.- Check for Versioning: Ensure that you are working with the correct version of the BOM or routing. If necessary, update to the latest version.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on maintaining BOMs and routings.
Related Information:
CS01
(Create BOM), CS02
(Change BOM), CA01
(Create Routing), and CA02
(Change Routing).By following these steps, you should be able to identify and resolve the cause of the PPECHK320 error in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
PPECHK319
Backflush supports no multi-level, multiple work centers (&1 &2)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPECHK318
The action points &1(&2) and &3(&4) have the same logical position
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPECHK321
Line area &1 contains no line objects
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPECHK322
No priority selected for alternative line &1 (&2 &3)
What causes this issue? No priority was selected for the alternative line &V1& at the assignment to the part of the line network. However, ot...
Click on this link to search all SAP messages.