How To Fix PPECHK308 - The end of alternative line &1 does not have a reporting point


PPECHK308 - Overview

  • Message type: E = Error

  • Message class: PPECHK - iPPE Consistency Check

  • Message number: 308

  • Message text: The end of alternative line &1 does not have a reporting point

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPECHK308 - The end of alternative line &1 does not have a reporting point ?
    The SAP error message PPECHK308 indicates that there is an issue with the alternative line in a production process or routing where the end of the line does not have a defined reporting point. This can occur in the context of production planning and execution, particularly when working with production orders, routings, or process orders.
    
    Cause: The error typically arises due to one of the following reasons: Missing Reporting Point: The alternative line in the routing or production process does not have a defined reporting point at its end. Reporting points are crucial for tracking progress and managing production. Incorrect Configuration: The configuration of the routing or production process may be incomplete or incorrect, leading to the absence of necessary reporting points. Data Inconsistencies: There may be inconsistencies in the master data related to the production process, such as missing or incorrectly defined operations.
    Solution: To resolve the PPECHK308 error, you can take the following steps: Check the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author