How To Fix PPECHK212 - Characteristic value &1 of &2 &3 is not defined for resource &4


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPECHK - iPPE Consistency Check

  • Message number: 212

  • Message text: Characteristic value &1 of &2 &3 is not defined for resource &4

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPECHK212 - Characteristic value &1 of &2 &3 is not defined for resource &4 ?

    The SAP error message PPECHK212 indicates that a specific characteristic value for a resource is not defined in the system. This error typically occurs in the context of production planning and detailed scheduling, particularly when working with resources and their associated characteristics in SAP's Production Planning (PP) module.

    Cause:

    The error message PPECHK212 is triggered when:

    • A characteristic value (e.g., a specific attribute or property) for a resource (like a machine or work center) is being referenced in a planning or scheduling operation, but that characteristic value has not been defined for the specified resource.
    • The resource in question is expected to have certain characteristics that are not configured correctly in the system.

    Solution:

    To resolve this error, you can take the following steps:

    1. Check Resource Configuration:

      • Go to the resource (work center or production resource/tool) in the SAP system.
      • Verify that the characteristic value mentioned in the error message is indeed defined for that resource.
      • If it is not defined, you will need to add the characteristic value to the resource.
    2. Define Characteristic Values:

      • Navigate to the configuration settings for the resource.
      • Add the missing characteristic value to the resource's master data.
      • Ensure that the characteristic is correctly assigned to the resource type.
    3. Review Planning Parameters:

      • Check if the planning parameters or settings that reference the resource are correctly set up.
      • Ensure that the planning scenario or order type is compatible with the resource's characteristics.
    4. Test the Changes:

      • After making the necessary adjustments, re-run the planning or scheduling operation that triggered the error to confirm that the issue has been resolved.
    5. Consult Documentation:

      • If you are unsure about how to define characteristic values or configure resources, refer to SAP documentation or consult with your SAP support team for guidance.

    Related Information:

    • Transaction Codes:

      • You may use transaction codes like CR01 (Create Work Center), CR02 (Change Work Center), or CR03 (Display Work Center) to manage resource characteristics.
    • Master Data Management:

      • Ensure that your master data management practices are robust, as missing or incorrect data can lead to various planning errors.
    • SAP Notes:

      • Check for any relevant SAP Notes that might address specific issues related to this error message or provide additional troubleshooting steps.

    By following these steps, you should be able to identify and correct the underlying issue causing the PPECHK212 error in your SAP system.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant