How To Fix PPECHK104 - &2 &3 has no &4


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPECHK - iPPE Consistency Check

  • Message number: 104

  • Message text: &2 &3 has no &4

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPECHK104 - &2 &3 has no &4 ?

    The SAP error message PPECHK104 typically indicates that there is a problem with the planning data in the SAP system, specifically related to the availability of a certain resource or component in the context of production planning or capacity planning.

    Cause:

    The error message PPECHK104 generally means that the system is unable to find a required resource or component for a specific planning object. The placeholders (&2, &3, &4) in the message usually represent:

    • &2: The specific planning object (e.g., a production order, a planned order, etc.)
    • &3: The specific resource or component that is missing.
    • &4: The type of resource or component that is expected (e.g., a work center, material, etc.).

    This error can occur due to several reasons:

    1. The resource or component has not been defined in the system.
    2. The resource or component is inactive or not available for the planning period.
    3. There may be a configuration issue in the planning settings.
    4. The master data (like material master, work center, etc.) may not be correctly maintained.

    Solution:

    To resolve the PPECHK104 error, you can follow these steps:

    1. Check Master Data:

      • Verify that the resource or component mentioned in the error message is correctly defined in the system.
      • Ensure that the material master, work center, or any other relevant master data is active and correctly configured.
    2. Check Availability:

      • Ensure that the resource or component is available for the planning period in question. This may involve checking the availability of materials or the capacity of work centers.
    3. Review Planning Settings:

      • Check the planning settings in the configuration to ensure that the system is set up to recognize the required resources or components.
    4. Check for Inactive Objects:

      • If the resource or component is inactive, you may need to activate it or create a new one if it does not exist.
    5. Consult Documentation:

      • Refer to SAP documentation or help resources for more specific guidance related to the error message and the context in which it occurs.
    6. Debugging:

      • If the issue persists, consider using transaction codes like SE80 or SE37 to debug the relevant function modules or programs that are generating the error.
    7. Contact Support:

      • If you are unable to resolve the issue, consider reaching out to your SAP support team or consulting with SAP support for further assistance.

    Related Information:

    • Transaction Codes: You may want to use transaction codes like MD04 (Stock/Requirements List) or CO02 (Change Production Order) to analyze the planning situation.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional troubleshooting steps.
    • Community Forums: SAP Community or other forums can be helpful for finding similar issues faced by other users and their solutions.

    By following these steps, you should be able to identify and resolve the cause of the PPECHK104 error in your SAP system.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker