How To Fix PPECHK002 - Save your changes before executing the consistency check


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPECHK - iPPE Consistency Check

  • Message number: 002

  • Message text: Save your changes before executing the consistency check

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPECHK002 - Save your changes before executing the consistency check ?

    The SAP error message PPECHK002 ("Save your changes before executing the consistency check") typically occurs in the context of the SAP Production Planning and Detailed Scheduling (PP/DS) module. This error indicates that you are trying to execute a consistency check on a planning object (like a production order or a planning run) without first saving any changes you may have made.

    Cause:

    The error is triggered when:

    • You have made changes to a planning object (e.g., a production order, a planning run, etc.) but have not saved those changes.
    • You attempt to run a consistency check (which is meant to validate the integrity of the data) without saving the current state of the object.

    Solution:

    To resolve this error, follow these steps:

    1. Save Your Changes: Before executing the consistency check, ensure that you save any changes you have made to the planning object. Look for a "Save" button or use the keyboard shortcut (usually Ctrl + S) to save your changes.
    2. Re-run the Consistency Check: After saving, you can then proceed to execute the consistency check again.

    Related Information:

    • Consistency Check: This is a process in SAP that verifies the integrity and correctness of planning data. It checks for inconsistencies that could lead to errors in production planning.
    • Transaction Codes: Familiarize yourself with relevant transaction codes in SAP that pertain to the PP/DS module, such as /SAPAPO/PPDS for planning runs or /SAPAPO/CC for consistency checks.
    • User Permissions: Ensure that you have the necessary permissions to save changes and execute consistency checks in the SAP system.
    • SAP Notes: If the issue persists or if you encounter related problems, consider checking SAP Notes for any known issues or patches that may address the error.

    By following these steps, you should be able to resolve the PPECHK002 error and successfully execute the consistency check in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author