Do you have any question about this error?
Message type: E = Error
Message class: PPECCTDP - Messages for TDPP Consistency Check
Message number: 000
Message text: TDPP mode duration & ChgNo Conf: Act.: &1, Mode: &2, ECN: &3, PlngVer: &4
There is a conflict between the time dependent process parameters (TDPP)
and the change number for this mode duration.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
In the Integrated Product and Process Engineering transaction:
- Load the activity
- Load the mode.
- Go to the TDPP - Mode Duration tab
- Correct the TDPP entry
Error message extract from SAP system. Copyright SAP SE.
PPECCTDP000
- TDPP mode duration & ChgNo Conf: Act.: &1, Mode: &2, ECN: &3, PlngVer: &4 ?The SAP error message PPECCTDP000 typically relates to issues in the context of the Product Engineering and Change Management processes, particularly when dealing with the configuration of change numbers and planning versions in the context of a Technical Data Package (TDP).
Cause:
This error message can occur due to several reasons, including:
- Invalid Change Number (ChgNo): The change number specified may not be valid or may not exist in the system.
- Incorrect Mode Duration: The mode duration specified may not be appropriate for the given configuration or may exceed the allowed limits.
- Planning Version Issues: The planning version specified may not be active or may not be correctly configured for the change number or mode.
- Data Inconsistencies: There may be inconsistencies in the data related to the Engineering Change Number (ECN) or the planning version.
Solution:
To resolve this error, you can take the following steps:
- Verify Change Number: Check if the change number (ChgNo) exists and is active in the system. Ensure that it is correctly entered in the transaction.
- Check Mode Duration: Review the mode duration settings to ensure they are within acceptable limits and correctly configured for the change number.
- Validate Planning Version: Ensure that the planning version (PlngVer) is active and correctly set up for the relevant change number and mode.
- Review Configuration: Check the configuration settings related to the Technical Data Package (TDP) and ensure that all required fields are filled out correctly.
- Consult Documentation: Refer to SAP documentation or help resources for specific details on the error message and its context.
- Contact Support: If the issue persists, consider reaching out to your SAP support team or consulting with SAP support for further assistance.
Related Information:
By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
PPEBAPI884
Internal error when calling &1
What causes this issue? An internal error has occurred.System Response The system issues an error message and will not allow you to continue with th...
PPEBAPI883
Product &1 does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPECCTDP001
TDPP Capacity Cons & ChgNo Conf: Act.: &1, Mode: &2, ECN: &3, PlngVer: &4
What causes this issue? There is a conflict between the time dependent process parameters (TDPP) and the change number for this capacity consumption....
PPECCTDP002
TDPP component con & ECN conf: str node: &1, var: &2, ECN: &3, plng: &4
What causes this issue? There is a conflict between the time dependent process parameters (TDPP) and the change number for this component consumption...
Click on this link to search all SAP messages.