How To Fix PPEBAL403 - Internal error when moving activity


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPEBAL - Line Balance Message

  • Message number: 403

  • Message text: Internal error when moving activity

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPEBAL403 - Internal error when moving activity ?

    The SAP error message PPEBAL403 ("Internal error when moving activity") typically occurs in the context of SAP's Project System (PS) or Production Planning (PP) modules, particularly when dealing with activity management or scheduling. This error indicates that there is an internal inconsistency or issue when trying to move an activity within a project or production order.

    Possible Causes:

    1. Data Inconsistency: There may be inconsistencies in the data related to the project or activity, such as missing or incorrect assignment of resources, dates, or dependencies.
    2. System Bugs: There could be a bug in the SAP system or a specific version that is causing this error.
    3. Configuration Issues: Incorrect configuration settings in the project or production planning module may lead to this error.
    4. Authorization Issues: Lack of proper authorizations to perform the move operation can also trigger this error.
    5. Locking Issues: If the activity is locked by another user or process, it may lead to this internal error.

    Solutions:

    1. Check Data Consistency:

      • Review the project or order data for any inconsistencies. Ensure that all required fields are filled out correctly and that there are no missing links between activities.
      • Use transaction codes like CJ20N (Project Builder) or CO02 (Change Production Order) to check the details.
    2. Review Logs:

      • Check the system logs for any additional error messages or warnings that may provide more context about the issue. Use transaction SLG1 to view application logs.
    3. Recreate the Activity:

      • If the error persists, consider deleting the problematic activity and recreating it. This can sometimes resolve internal inconsistencies.
    4. Check Authorizations:

      • Ensure that the user has the necessary authorizations to perform the move operation. Consult with your SAP security team if needed.
    5. System Update:

      • If you suspect a bug, check if there are any available patches or updates for your SAP system that address this issue. Consult SAP Notes or the SAP Support Portal.
    6. Contact SAP Support:

      • If none of the above solutions work, consider reaching out to SAP Support with detailed information about the error, including the steps to reproduce it, system version, and any relevant logs.

    Related Information:

    • SAP Notes: Search for relevant SAP Notes in the SAP Support Portal that may address this specific error or provide additional troubleshooting steps.
    • Community Forums: Check SAP Community forums or other user groups for similar issues and solutions shared by other users.
    • Documentation: Review the official SAP documentation for the Project System or Production Planning modules for best practices and configuration guidelines.

    By following these steps, you should be able to diagnose and potentially resolve the PPEBAL403 error in your SAP environment.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant