Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close

How To Fix PPEBAL147 - Line balance &1 was unlocked


PPEBAL147 - Overview

  • Message type: E = Error

  • Message class: PPEBAL - Line Balance Message

  • Message number: 147

  • Message text: Line balance &1 was unlocked

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


PPEBAL147 - Details

  • The SAP error message PPEBAL147 indicates that a line balance in a production environment has been unlocked. This typically occurs in the context of production planning and execution, particularly when using the SAP Production Planning (PP) module or the SAP Advanced Planning and Optimization (APO) module.
    
    Cause: The error message PPEBAL147 is triggered when an attempt is made to perform an operation on a line balance that has been unlocked. This can happen due to various reasons, such as: A user manually unlocked the line balance for editing or adjustments. A system process or job that was supposed to lock the line balance did not execute properly. There may be a configuration issue or a missing authorization that prevents the system from locking the line balance as expected.
    Solution: To resolve the PPEBAL147 error, consider the following steps: Check Line Balance Status: Verify the status of the line balance in question. Ensure that it is indeed unlocked and

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


PPEBAL147 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker