How To Fix PPEBAL118 - A line balance cannot be created for nodes of type &1


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPEBAL - Line Balance Message

  • Message number: 118

  • Message text: A line balance cannot be created for nodes of type &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPEBAL118 - A line balance cannot be created for nodes of type &1 ?

    The SAP error message PPEBAL118 indicates that a line balance cannot be created for nodes of a specific type in the production planning environment. This error typically arises in the context of SAP's Production Planning and Detailed Scheduling (PP/DS) or similar modules where line balancing is crucial for efficient production processes.

    Cause:

    The error message is triggered when the system encounters a node type that is not compatible with line balancing. This can happen for several reasons, including:

    1. Node Type Restrictions: The node type specified (denoted by &1 in the error message) may not support line balancing. For example, certain types of nodes like storage locations or non-production nodes may not be eligible for line balancing.

    2. Configuration Issues: There may be configuration settings in the system that prevent line balancing for certain node types. This could be due to settings in the production planning configuration or master data.

    3. Data Integrity Issues: There may be inconsistencies or missing data in the master data related to the nodes, such as missing production resources or incorrect settings.

    Solution:

    To resolve the PPEBAL118 error, consider the following steps:

    1. Check Node Type: Verify the type of node that is causing the error. Ensure that it is a valid node type for line balancing. If it is not, you may need to adjust your planning strategy or use a different node type.

    2. Review Configuration: Check the configuration settings in the SAP system related to line balancing. Ensure that the settings allow for line balancing for the specific node types you are working with.

    3. Validate Master Data: Ensure that all relevant master data (e.g., production resources, work centers, etc.) is correctly set up and complete. Look for any missing or incorrect entries that could be causing the issue.

    4. Consult Documentation: Refer to SAP documentation or help resources for specific details on node types and their compatibility with line balancing.

    5. Seek Support: If the issue persists, consider reaching out to your SAP support team or consulting with an SAP expert who can provide more tailored assistance based on your specific system configuration and requirements.

    Related Information:

    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional troubleshooting steps.
    • SAP Community: Engage with the SAP Community forums to see if other users have encountered similar issues and what solutions they have found.
    • Training and Documentation: Review training materials or documentation related to Production Planning and Detailed Scheduling to better understand how line balancing works and the requirements for different node types.

    By following these steps, you should be able to identify the cause of the PPEBAL118 error and implement a suitable solution.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant