Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close

How To Fix PPEBAL109 - &1 between &2 and &3 will be created when you save


PPEBAL109 - Overview

  • Message type: E = Error

  • Message class: PPEBAL - Line Balance Message

  • Message number: 109

  • Message text: &1 between &2 and &3 will be created when you save

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


PPEBAL109 - Details

  • The SAP error message PPEBAL109 typically indicates that there is an issue with the balance of a planning object in the SAP system, particularly in the context of SAP's Production Planning and Detailed Scheduling (PP/DS) or similar modules. The message suggests that there is an imbalance between two specified entities (often between a source and a target, such as a product and its components or between different planning levels).
    
    Cause: The error message PPEBAL109 is usually triggered by one of the following reasons: Data Imbalance: There is a discrepancy in the data that is being processed, such as a mismatch in quantities, dates, or other relevant parameters between the two entities.
    Configuration Issues: Incorrect configuration settings in the planning parameters or master data can lead to inconsistencies. Missing Master Data: Required master data (like BOMs, routing, or product master data) may be incomplete or missing. Planning Parameters: Incorrect planning parameters or settings in the planning run

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


PPEBAL109 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker