How To Fix PPEARCHCMP039 - ***** Multilevel explosion was specified


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPEARCHCMP - iPPE Archiving Components

  • Message number: 039

  • Message text: ***** Multilevel explosion was specified

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPEARCHCMP039 - ***** Multilevel explosion was specified ?

    The SAP error message PPEARCHCMP039 with the description "Multilevel explosion was specified" typically occurs in the context of production planning and control, particularly when dealing with the Product Structure (BOM) and the planning of materials.

    Cause:

    This error usually arises when the system is trying to perform a multilevel explosion of a Bill of Materials (BOM) but encounters a situation where it cannot proceed. This can happen due to several reasons, including:

    1. Incorrect BOM Configuration: The BOM may not be set up correctly, or there may be missing components that are required for the multilevel explosion.
    2. Missing Master Data: Required master data such as material master records, routing, or work centers may be incomplete or missing.
    3. Planning Parameters: The planning parameters may not be set correctly, leading to issues in how the system interprets the multilevel structure.
    4. Circular References: There may be circular references in the BOM structure that prevent the system from completing the explosion.
    5. Incompatible Settings: The settings in the material master or BOM may not be compatible with the multilevel explosion process.

    Solution:

    To resolve the PPEARCHCMP039 error, you can take the following steps:

    1. Check BOM Configuration:

      • Verify that the BOM is correctly configured and that all components are present.
      • Ensure that the BOM is valid for the material you are trying to plan.
    2. Review Master Data:

      • Check the material master records for the components in the BOM to ensure they are complete and correctly set up.
      • Ensure that all necessary routing and work center data are available.
    3. Examine Planning Parameters:

      • Review the planning parameters in the material master and ensure they are set correctly for multilevel planning.
      • Check the settings in the planning strategy and ensure they align with your production process.
    4. Identify Circular References:

      • Inspect the BOM for any circular references that may be causing the explosion to fail. This can often happen if a component references itself or if there are interdependencies that create a loop.
    5. Consult SAP Documentation:

      • Refer to SAP documentation or help resources for specific guidance on the error message and related configuration settings.
    6. Testing:

      • After making changes, perform a test run of the planning process to see if the error persists.
    7. Seek Support:

      • If the issue continues, consider reaching out to your SAP support team or consulting with an SAP expert who can provide more tailored assistance.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like CS03 (Display BOM), CS02 (Change BOM), or MD04 (Stock/Requirements List) to investigate the BOM and material data.
    • SAP Notes: Check for any relevant SAP Notes that may address known issues related to this error message.
    • Documentation: Review SAP Help documentation for Production Planning and Control for more insights into BOM management and multilevel planning.

    By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author