Message type: E = Error
Message class: PPEACT - Messages for iPPE ACT Application (Activities)
Message number: 817
Message text: There must be an activity of type 'operation' under &1 &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PPEACT817
- There must be an activity of type 'operation' under &1 &2 ?The SAP error message PPEACT817 indicates that there is a missing activity of type 'operation' in a specific production process or routing. This error typically occurs in the context of Production Planning (PP) or Production Engineering (PE) when trying to create or modify a production order, routing, or work center.
Cause: The error is triggered when the system expects to find at least one operation defined in the routing or production process, but none is present. This can happen due to several reasons: The routing has not been properly defined or is incomplete. The operation type is incorrectly set or missing. The routing was deleted or not saved correctly. There may be a configuration issue in the production process.
Solution: To resolve the PPEACT817 error, you can follow these steps: Check the Routing: Go to the routing transaction (e.g., CA03 for display routing). Verify that the routing for the specified material (indicated by &1) and plant (indicated by &2) contains at
Get instant SAP help. Sign up for our Free Essentials Plan.
PPEACT816
At least one mode at &1 &2 must be available for automatic selection
What causes this issue? For planning in APO, you must specify a mode with a mode priority that the system can choose automatically at each activity. ...
PPEACT815
The reporting/action point &1 is used several times in &2 &3 and &4
What causes this issue? The reporting point/action point &v1& cannot be used multiple times in the routing as it is either only executed at t...
PPEACT818
There can only be one activity of type 'setup' under &1 &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPEACT819
There can only be one activity of type 'tear down' under &1 &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.