Message type: E = Error
Message class: PPEACT - Messages for iPPE ACT Application (Activities)
Message number: 814
Message text: Object &1 &2 is used several times in &3 &4
The routing object &V1& &V2& is used more than once in the routing.
This is not allowed.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Use the new routing element.
Error message extract from SAP system. Copyright SAP SE.
PPEACT814
- Object &1 &2 is used several times in &3 &4 ?The SAP error message PPEACT814 indicates that an object (such as a material, resource, or production version) is being used multiple times in a specific context, which can lead to inconsistencies or conflicts in the planning process. This error typically arises in the context of Production Planning (PP) or Advanced Planning and Optimization (APO) when the system detects duplicate entries for the same object in a planning scenario.
Cause: The error can occur due to several reasons: Duplicate Entries: The object is defined multiple times in the planning data, such as in a production order, planning run, or master data. Incorrect Configuration: There may be issues with the configuration of the planning parameters or settings that allow for the same object to be referenced multiple times. Data Migration Issues: If data has been migrated from another system or if there have been recent changes to the master data, duplicates may have been inadvertently created. User Error:
Get instant SAP help. Sign up for our Free Essentials Plan.
PPEACT813
Relationships between activities at &1 &2 are interrupted &3 times
What causes this issue? The relationships in &V1& &V2& are incomplete. This leads to inconsistent sequences of the individual activit...
PPEACT812
&1 &2 is not included in the relationships of &3 &4
What causes this issue? &V1& &V2& is not included in &V3& &V4&. The activity sequence in SAP APO has not been specifi...
PPEACT815
The reporting/action point &1 is used several times in &2 &3 and &4
What causes this issue? The reporting point/action point &v1& cannot be used multiple times in the routing as it is either only executed at t...
PPEACT816
At least one mode at &1 &2 must be available for automatic selection
What causes this issue? For planning in APO, you must specify a mode with a mode priority that the system can choose automatically at each activity. ...
Click on this link to search all SAP messages.