How To Fix PPEACT809 - Finished structure check for &1 &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPEACT - Messages for iPPE ACT Application (Activities)

  • Message number: 809

  • Message text: Finished structure check for &1 &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPEACT809 - Finished structure check for &1 &2 ?

    The SAP error message PPEACT809, which states "Finished structure check for &1 &2," typically occurs in the context of Production Planning and Execution (PP) or related modules when there is an issue with the structure of a production order, bill of materials (BOM), or routing.

    Cause:

    The error can be caused by several factors, including:

    1. Missing or Incomplete Data: The production order or BOM may have missing components or incomplete data that prevents the system from processing it correctly.
    2. Incorrect Configuration: There may be configuration issues in the material master, BOM, or routing that lead to inconsistencies.
    3. Data Inconsistencies: There could be inconsistencies in the data between different modules (e.g., between the material master and BOM).
    4. Authorization Issues: Sometimes, the user may not have the necessary authorizations to access or modify certain data, leading to this error.
    5. System Bugs or Issues: Occasionally, this error can be triggered by bugs in the SAP system or issues with the specific version of SAP being used.

    Solution:

    To resolve the PPEACT809 error, you can take the following steps:

    1. Check Data Completeness: Verify that all necessary data for the production order, BOM, and routing is complete and correctly configured. Ensure that all components are available and correctly defined.

    2. Review Configuration: Check the configuration settings in the material master, BOM, and routing to ensure they are set up correctly. Look for any discrepancies that might cause the error.

    3. Use Transaction Codes: Utilize relevant transaction codes to check the status of the production order or BOM:

      • CS03: Display BOM
      • CO03: Display Production Order
      • CA03: Display Routing
    4. Check Authorizations: Ensure that the user has the necessary authorizations to access and modify the relevant data. If not, contact your SAP security administrator.

    5. Consult SAP Notes: Search for relevant SAP Notes in the SAP Support Portal that may address this specific error. There may be patches or updates available that resolve known issues.

    6. Debugging: If you have access to technical resources, consider debugging the program to identify the exact point of failure. This may require the assistance of an ABAP developer.

    7. Contact SAP Support: If the issue persists after trying the above steps, consider reaching out to SAP Support for further assistance. Provide them with detailed information about the error, including the context in which it occurs.

    Related Information:

    • SAP Documentation: Review the official SAP documentation for Production Planning and Execution for more insights into the error and its context.
    • Community Forums: Check SAP Community forums or other user groups where similar issues may have been discussed.
    • Training and Resources: Consider additional training or resources on SAP PP to better understand the processes and configurations involved.

    By following these steps, you should be able to identify and resolve the cause of the PPEACT809 error in your SAP system.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker