Message type: E = Error
Message class: PPEACT - Messages for iPPE ACT Application (Activities)
Message number: 800
Message text: **************Consistency Check***********************
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PPEACT800
- **************Consistency Check*********************** ?The SAP error message PPEACT800 is related to the Production Planning and Execution (PP/PE) module, specifically during the execution of production orders or related activities. This error typically indicates that there is a consistency check failure in the system, which means that some data or configuration does not meet the required criteria for processing. Causes: Data Inconsistencies: There may be inconsistencies in the master data, such as material master records, bill of materials (BOM), routing, or production order data. Missing or Incorrect Configuration: The configuration settings for production planning or execution may be incorrect or incomplete. Status Issues: The production order or related documents may be in an incorrect status that prevents processing. Resource Availability: There may be issues with the availability of resources (e.g., machines, labor) that are required for the production process. Capacity Planning Issues: Problems with capacity planning or scheduling may lead to inconsistencies in the production process. Solutions: Check Master Data: Review the relevant
Get instant SAP help. Sign up for our Free Essentials Plan.
PPEACT799
************** Time Analysis - End *************************************
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPEACT774
Only one determination type can be transferred to the time analysis
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPEACT801
Consistency check on &1 &2 was started at &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPEACT802
Consistency check on &1 &2 was finished at &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.