Do you have any question about this error?
Message type: E = Error
Message class: PPEACT - Messages for iPPE ACT Application (Activities)
Message number: 547
Message text: No standard value determination type is defined for time analysis
No standard value determination type for transferring the time analysis
has been defined in Customizing.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
In Customizing transaction oppeact01, create an entry for the standard
value determination type 'time analysis transfer' and set the TA_FLAG
(This can be set for one entry only).
Error message extract from SAP system. Copyright SAP SE.
PPEACT547
- No standard value determination type is defined for time analysis ?The SAP error message PPEACT547 indicates that there is no standard value determination type defined for time analysis in the context of production planning or project management. This error typically arises when the system is trying to perform a time analysis for a process or activity, but it cannot find the necessary configuration to determine standard values.
Cause:
- Missing Configuration: The most common cause is that the standard value determination type has not been defined in the system for the relevant application area (e.g., Production Planning, Project System).
- Incorrect Settings: There may be incorrect or incomplete settings in the configuration related to the standard values for the specific activity or process.
- Master Data Issues: The master data for the relevant work center, activity type, or production version may not be properly maintained.
Solution:
To resolve the PPEACT547 error, you can follow these steps:
Check Configuration:
- Go to the configuration settings for the relevant module (e.g., Production Planning or Project System).
- Navigate to the area where standard value determination types are defined (e.g., SPRO -> Production -> Basic Data -> Work Center -> Define Standard Values).
- Ensure that a standard value determination type is defined for the time analysis you are trying to perform.
Define Standard Value Determination Type:
- If no standard value determination type exists, you will need to create one. This involves specifying the parameters and values that the system should use for time analysis.
- Make sure to assign the newly created determination type to the relevant work centers or activity types.
Review Master Data:
- Check the master data for the work center or activity type involved in the process. Ensure that all necessary fields are filled out correctly, including the standard values.
- If you are using a specific production version, ensure that it is correctly set up and linked to the relevant work center.
Testing:
- After making the necessary changes, perform a test to see if the error persists. Try to execute the same transaction or process that previously resulted in the error.
Consult Documentation:
- Refer to SAP documentation or help resources for more detailed guidance on configuring standard value determination types specific to your version of SAP.
Related Information:
SPRO
for configuration, CR01
for creating work centers, or C223
for defining standard values.If the issue persists after following these steps, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Get instant SAP help. Start your 7-day free trial now.
PPEACT546
Enter a mode number
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPEACT545
Resource &1 is already defined as a secondary resource/reqmnt at &2 &3
What causes this issue? You have tried to specify a resource that is relevant for scheduling, which has already been assigned to the mode as capacity...
PPEACT548
Plant &1 for requirements &2 does not match plant &3 in mode &4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPEACT549
Mode &1 with change status &2 has already been historically deleted
What causes this issue? You have tried to edit a mode that has already been deleted with its history.System Response The system issues an error mess...
Click on this link to search all SAP messages.