How To Fix PPEACT543 - Specified capacity requirement &1 is assigned more than once at &2 &3


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPEACT - Messages for iPPE ACT Application (Activities)

  • Message number: 543

  • Message text: Specified capacity requirement &1 is assigned more than once at &2 &3

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPEACT543 - Specified capacity requirement &1 is assigned more than once at &2 &3 ?

    The SAP error message PPEACT543 indicates that a specified capacity requirement has been assigned more than once at a particular location, which can lead to inconsistencies in capacity planning and scheduling. This error typically occurs in the context of production planning and capacity management within SAP.

    Cause:

    The error is triggered when:

    1. A capacity requirement (such as a production order, planned order, or other scheduling elements) is assigned to a specific capacity (work center, machine, etc.) more than once for the same time period.
    2. There may be overlapping or conflicting assignments in the planning data, which can happen due to incorrect data entry, duplicate orders, or issues in the planning process.

    Solution:

    To resolve the PPEACT543 error, you can take the following steps:

    1. Check Capacity Assignments:

      • Go to the relevant work center or capacity planning transaction (e.g., CR01, CR02 for work centers).
      • Review the capacity assignments for the specified time period and identify any duplicates.
    2. Review Production Orders:

      • Check the production orders or planned orders that are causing the conflict. You can use transaction codes like CO03 (Display Production Order) or MD04 (Stock/Requirements List) to analyze the orders.
      • Look for overlapping orders that may be scheduled for the same work center at the same time.
    3. Adjust Scheduling:

      • If you find duplicate assignments, you may need to adjust the scheduling of one of the orders to eliminate the conflict. This could involve rescheduling, changing the order quantity, or modifying the start and finish dates.
    4. Check for Errors in Planning:

      • Review the planning run logs (transaction MD01 or MD02) to identify any errors or warnings that may have occurred during the planning process.
      • Ensure that the planning parameters are set correctly to avoid such conflicts in the future.
    5. Consult Documentation:

      • Refer to SAP documentation or help resources for more detailed guidance on capacity planning and error resolution.

    Related Information:

    • Transaction Codes:

      • CO03: Display Production Order
      • MD04: Stock/Requirements List
      • CR01/CR02: Create/Change Work Center
      • MD01/MD02: MRP Run
    • SAP Notes:

      • Check SAP Notes for any known issues or patches related to this error message. You can search for relevant notes in the SAP Support Portal.
    • Capacity Planning Best Practices:

      • Regularly monitor and review capacity utilization.
      • Implement proper planning strategies to avoid overlapping orders.
      • Train users on data entry and planning processes to minimize errors.

    By following these steps, you should be able to identify the cause of the PPEACT543 error and implement a solution to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant