How To Fix PPEACT105 - Variable capacity reqmts are not allowed at &1 &2, type 'setup/tear down'


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPEACT - Messages for iPPE ACT Application (Activities)

  • Message number: 105

  • Message text: Variable capacity reqmts are not allowed at &1 &2, type 'setup/tear down'

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPEACT105 - Variable capacity reqmts are not allowed at &1 &2, type 'setup/tear down' ?

    The SAP error message PPEACT105 indicates that there is an issue with the variable capacity requirements for a specific operation in a production process. The message specifically states that variable capacity requirements are not allowed for the type 'setup/tear down' at the specified location (indicated by &1 &2).

    Cause:

    The error typically arises in the context of production planning and scheduling when:

    1. You are trying to define variable capacity requirements for a setup or teardown operation, which is not permitted in the system.
    2. The configuration of the production process or the routing may not support variable capacity for these types of operations.
    3. There may be a mismatch in the settings of the production version or the work center.

    Solution:

    To resolve this error, you can take the following steps:

    1. Check the Routing:

      • Review the routing for the production order and ensure that the setup and teardown operations are correctly defined. Variable capacity should not be assigned to these operations.
    2. Adjust Work Center Settings:

      • Go to the work center configuration and check the capacity planning settings. Ensure that the setup and teardown operations are set to fixed capacity rather than variable.
    3. Review Production Version:

      • If you are using a production version, check its configuration to ensure that it aligns with the requirements of the routing and work center.
    4. Consult Documentation:

      • Refer to SAP documentation or help resources for specific guidelines on capacity planning and the limitations regarding setup and teardown operations.
    5. SAP Notes:

      • Check for any relevant SAP Notes that might address this issue or provide additional guidance.
    6. Testing:

      • After making the necessary adjustments, test the changes by creating a new production order or reprocessing the existing one to see if the error persists.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like CA01 (Create Routing), CR01 (Create Work Center), or C223 (Define Production Version) to make the necessary changes.
    • Capacity Planning: Understanding the concepts of capacity planning in SAP, including fixed vs. variable capacity, can help prevent similar issues in the future.
    • SAP Community: Engaging with the SAP Community forums can provide insights from other users who may have encountered and resolved similar issues.

    By following these steps, you should be able to resolve the PPEACT105 error and ensure that your production planning processes run smoothly.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author