How To Fix PPE_INST203 - Unit of measure for component variant &1 / &2 is unsuitable


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPE_INST - Messages for Geometric Instances

  • Message number: 203

  • Message text: Unit of measure for component variant &1 / &2 is unsuitable

  • Show details Hide details
  • What causes this issue?

    You are checking whether the number of geometric instances under an item
    variant matches the quantity specified in the item variant. The system
    determines that the quantity specified in the item variant is not
    dimensionless. However, a comparison of the quantity with the number of
    geometric instances is only useful for the unit "piece" (ISO code "PCE")
    or for a dimensionless unit of measure that is to be considered
    identical.

    System Response

    The system cancels the consistency check with an error message.

    How to fix this error?

    In the item variant, specify the quantity with respect to a unit with
    the ISO code "PCE".
    If this is not possible and a material is entered in the item variant,
    you can specify in the material master an alternative unit of measure
    that has the ISO code "PCE", and refer this alternative unit of measure
    with conversion factors to the base unit of measure of the material. If
    the unit of measure of the item variant in the material master likewise
    refers to the base unit of measure, the system converts the quantity in
    the item variant to "piece" (ISO code "PCE").

    Procedure for System Administrators

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPE_INST203 - Unit of measure for component variant &1 / &2 is unsuitable ?

    The SAP error message PPE_INST203 indicates that there is an issue with the unit of measure (UoM) for a component variant in a production or planning scenario. This error typically arises in the context of Production Planning (PP) or Production Engineering (PE) when the system encounters a component variant that has an incompatible or unsuitable unit of measure.

    Cause:

    1. Incompatible Unit of Measure: The unit of measure defined for the component variant does not match the expected unit of measure for the operation or the parent material.
    2. Configuration Issues: There may be configuration issues in the material master or BOM (Bill of Materials) that lead to mismatched units of measure.
    3. Missing or Incorrect Data: The component variant may not have the correct data set up in the material master, such as the base unit of measure or alternative units of measure.
    4. Unit of Measure Conversion: If there are conversion factors defined, they may not be set up correctly, leading to incompatibility.

    Solution:

    1. Check Material Master: Verify the unit of measure settings in the material master for both the component variant and the parent material. Ensure that the base unit of measure is correctly defined.
    2. Review BOM: Check the Bill of Materials (BOM) for the parent material to ensure that the component variant is correctly defined and that the units of measure are compatible.
    3. Adjust Unit of Measure: If necessary, adjust the unit of measure for the component variant to match the expected unit of measure for the operation.
    4. Conversion Factors: If conversion factors are used, ensure they are correctly defined and that the system can convert between the units of measure without issues.
    5. Consult Documentation: Review SAP documentation or help resources for specific guidelines on unit of measure settings and compatibility.

    Related Information:

    • Transaction Codes: You may need to use transaction codes such as MM02 (Change Material), CS02 (Change BOM), or C223 (Maintain Unit of Measure) to make necessary adjustments.
    • SAP Notes: Check for any relevant SAP Notes that may address known issues or provide additional guidance on this error message.
    • Testing: After making changes, perform testing to ensure that the error is resolved and that the production or planning process can proceed without issues.

    If the problem persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in Production Planning or Material Management.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author