How To Fix PPE8113 - &1 &2 is broken down via node &3 &4


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPE8 - Messages From Explosion in iPPE

  • Message number: 113

  • Message text: &1 &2 is broken down via node &3 &4

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPE8113 - &1 &2 is broken down via node &3 &4 ?

    The SAP error message PPE8113 typically indicates that there is an issue with the production process in the context of Production Planning and Execution (PP/PE). The message suggests that a specific production order or process is broken down at a certain node in the production network.

    Cause:

    The error message PPE8113 can be caused by several factors, including:

    1. Resource Unavailability: The production resource (machine, labor, etc.) required for the operation is not available or is broken down.
    2. Capacity Issues: There may be insufficient capacity in the production line to handle the current workload.
    3. Incorrect Configuration: The production process or routing may not be correctly configured, leading to breakdowns in the production flow.
    4. Material Shortages: Required materials for the production process may not be available, causing the process to halt.
    5. Scheduling Conflicts: There may be scheduling conflicts that prevent the production order from being executed as planned.

    Solution:

    To resolve the PPE8113 error, you can take the following steps:

    1. Check Resource Availability: Verify that all necessary resources (machines, tools, labor) are available and operational. If any resources are down, schedule maintenance or repairs.
    2. Review Capacity Planning: Ensure that the production capacity is sufficient for the planned production. Adjust capacity settings if necessary.
    3. Examine Production Configuration: Review the routing and production process configuration to ensure that they are set up correctly. Make any necessary adjustments.
    4. Check Material Availability: Confirm that all required materials are available in the correct quantities. If materials are missing, procure them as needed.
    5. Adjust Scheduling: Look for any scheduling conflicts and resolve them by rescheduling production orders or adjusting priorities.

    Related Information:

    • Transaction Codes: You may use transaction codes like CO03 (Display Production Order) or MF50 (Planning Table) to analyze the production order and its status.
    • Logs and Reports: Check logs and reports related to production orders to identify any additional issues or warnings that may provide more context for the breakdown.
    • SAP Notes: Look for relevant SAP Notes or documentation that may address specific issues related to the PPE8113 error.
    • Consult with SAP Support: If the issue persists, consider reaching out to SAP support for further assistance, especially if it appears to be a system-related issue.

    By following these steps, you should be able to identify the root cause of the PPE8113 error and implement a solution to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.