How To Fix PPE8113 - &1 &2 is broken down via node &3 &4


PPE8113 - Overview

  • Message type: E = Error

  • Message class: PPE8 - Messages From Explosion in iPPE

  • Message number: 113

  • Message text: &1 &2 is broken down via node &3 &4

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPE8113 - &1 &2 is broken down via node &3 &4 ?
    The SAP error message PPE8113 typically indicates that there is an issue with the production process in the context of Production Planning and Execution (PP/PE). The message suggests that a specific production order or process is broken down at a certain node in the production network.
    
    Cause: The error message PPE8113 can be caused by several factors, including: Resource Unavailability: The production resource (machine, labor, etc.) required for the operation is not available or is broken down. Capacity Issues: There may be insufficient capacity in the production line to handle the current workload. Incorrect Configuration: The production process or routing may not be correctly configured, leading to breakdowns in the production flow. Material Shortages: Required materials for the production process may not be available, causing the process to halt. Scheduling Conflicts: There may be scheduling conflicts that prevent the production order from being executed as planned.
    Solution: To resolve the PPE8113 error, you can take the following steps: Check Resource

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author