Message type: E = Error
Message class: PPE4 - Messages from the iPPE Access Object
Message number: 182
Message text: Validity period of &1 missing
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PPE4182
- Validity period of &1 missing ?The SAP error message PPE4182, which states "Validity period of &1 missing," typically occurs in the context of SAP's Production Planning and Detailed Scheduling (PP/DS) module. This error indicates that there is a missing validity period for a specific object, such as a planning object or a resource.
Cause: The error is usually caused by one of the following reasons: Missing Validity Dates: The object (e.g., a resource, material, or planning object) does not have a defined validity period. This means that the system cannot determine when the object is valid for use in planning. Incorrect Configuration: The configuration settings for the planning object may not have been set up correctly, leading to missing or incorrect validity periods. Data Inconsistencies: There may be inconsistencies in the master data or planning data that prevent the system from recognizing the validity period.
Solution: To resolve the PPE4182 error, you can take the following steps: Check Object Validity: Go to the relevant
Get instant SAP help. Sign up for our Free Essentials Plan.
PPE4181
Reference to &1 of this type is not allowed
What causes this issue? You have tried to enter an invalid reference to &v1& for this &v1&. You can only enter a reference from a &am...
PPE4180
Variant contains fixed quantities and cannot be assigned to any &1
What causes this issue? You have tried assigning a &v1& to a variant with a fixed quantity. This is not supported by the system. Fixed quanti...
PPE4183
Error determining routing type
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPE4184
Cost profile only allowed with SNP routing for &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.