Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close

How To Fix PPDS_PB069 - You have successfully changed the source of supply for &1


PPDS_PB069 - Overview

  • Message type: E = Error

  • Message class: PPDS_PB - Messages for New Fiori OData Planning Board

  • Message number: 069

  • Message text: You have successfully changed the source of supply for &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


PPDS_PB069 - Details

  • The SAP error message PPDS_PB069 indicates that you have successfully changed the source of supply for a specific product or material in the Production Planning and Detailed Scheduling (PP/DS) module. This message is not an error in the traditional sense but rather an informational message indicating that the action you took was successful.
    
    Cause: The message is triggered when a user changes the source of supply for a product in the PP/DS system. This could happen during planning activities, where a planner decides to switch from one supplier or production location to another for a specific material.
    Solution: Since this message indicates a successful operation, there is no corrective action needed. However, if you are looking to ensure that the change is appropriate or to verify the implications of this change, consider the following steps: Review the Change: Check the details of the new source of supply to ensure it meets your requirements (e.g., lead

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


PPDS_PB069 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker