How To Fix PPDS_PB066 - You have successfully rescheduled &1


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPDS_PB - Messages for New Fiori OData Planning Board

  • Message number: 066

  • Message text: You have successfully rescheduled &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPDS_PB066 - You have successfully rescheduled &1 ?

    The SAP error message PPDS_PB066 ("You have successfully rescheduled &1") is not actually an error message but rather an informational message indicating that a rescheduling operation has been completed successfully. This message is typically encountered in the context of SAP Advanced Planning and Optimization (APO) or SAP Integrated Business Planning (IBP) when working with production planning and detailed scheduling (PPDS).

    Cause:

    • The message is triggered after a successful execution of a rescheduling process in the PPDS module. It indicates that the system has successfully processed the rescheduling request for the specified object (e.g., production order, planned order, etc.).

    Solution:

    • Since this is an informational message and not an error, no specific action is required to resolve it. However, if you are looking to verify the results of the rescheduling, you can:
      • Check the details of the rescheduled orders or activities in the relevant planning board or transaction.
      • Review the changes made to the schedule to ensure they align with your planning objectives.
      • If you expected an error or issue during the rescheduling process, you may want to check the logs or messages preceding this one for any warnings or errors that might have occurred.

    Related Information:

    • Transaction Codes: You may encounter this message while using transaction codes related to PPDS, such as /SAPAPO/SDP94 (Planning Board) or /SAPAPO/RESCHED (Rescheduling).
    • Documentation: Refer to SAP Help documentation for PPDS for more detailed information on rescheduling processes and best practices.
    • Support: If you have further questions or if there are unexpected results following the rescheduling, consider reaching out to your SAP support team or consulting the SAP Community for additional insights.

    In summary, PPDS_PB066 is a confirmation message indicating successful rescheduling, and no corrective action is needed unless there are other issues to address.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker