Do you have any question about this error?
Message type: E = Error
Message class: PPDS_PB - Messages for New Fiori OData Planning Board
Message number: 042
Message text: &1 is unsuccessful
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PPDS_PB042
- &1 is unsuccessful ?The SAP error message PPDS_PB042 typically indicates that a planning run in the Production Planning and Detailed Scheduling (PP/DS) module has failed. This error can occur for various reasons, and understanding the cause is essential for resolving the issue.
Possible Causes:
- Data Issues: There may be missing or incorrect master data (e.g., materials, resources, or production versions) that the planning run requires.
- Configuration Errors: Incorrect settings in the PP/DS configuration can lead to planning failures.
- Capacity Constraints: If there are insufficient resources or capacity to meet the planned production, the planning run may fail.
- Planning Parameters: Incorrect planning parameters or settings in the planning run profile can cause issues.
- Locking Issues: If another process is locking the data that the planning run needs, it may result in a failure.
- System Performance: Performance issues or timeouts during the planning run can also lead to failures.
Solutions:
- Check Logs: Review the detailed logs of the planning run to identify specific errors or warnings that can provide more context about the failure.
- Validate Master Data: Ensure that all necessary master data is complete and accurate. Check for missing materials, resources, or incorrect configurations.
- Review Configuration: Verify that the PP/DS configuration settings are correct and align with your business processes.
- Capacity Check: Analyze the capacity of resources involved in the planning run. Ensure that there is enough capacity to meet the planned production.
- Adjust Planning Parameters: Review and adjust the planning parameters in the planning run profile if necessary.
- Release Locks: If locking issues are suspected, check for any active locks and release them if possible.
- System Performance: Monitor system performance and consider optimizing the planning run or increasing system resources if performance is an issue.
Related Information:
/SAPAPO/SDP94
(for planning board) or /SAPAPO/MC90
(for planning run) to analyze the planning data and logs.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or reach out to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
PPDS_PB041
&1 is successful
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPDS_PB040
&1 for &2 unsuccessful
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPDS_PB043
&1 You have successfully &2 from &3 to &4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPDS_PB044
&1 Your &2 operation has moved &3 to &4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.