How To Fix PPDS_PB015 - Regenerative planning executed successfully


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPDS_PB - Messages for New Fiori OData Planning Board

  • Message number: 015

  • Message text: Regenerative planning executed successfully

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPDS_PB015 - Regenerative planning executed successfully ?

    The SAP error message PPDS_PB015 indicates that a regenerative planning run has been executed successfully in the context of SAP Advanced Planning and Optimization (APO) or SAP Integrated Business Planning (IBP). This message is not necessarily an error but rather an informational message indicating that the regenerative planning process has completed without issues.

    Cause:

    • The message PPDS_PB015 is generated when the regenerative planning process is executed. It signifies that the planning run has been completed successfully, meaning that the system has recalculated the production plans, inventory levels, and other relevant planning data based on the current settings and master data.

    Solution:

    Since this message indicates a successful execution, there is typically no action required. However, if you are looking for further insights or need to verify the results of the planning run, consider the following steps:

    1. Review Planning Results: Check the planning results to ensure that the output meets your expectations. You can do this by reviewing the planned orders, production schedules, and other relevant data.

    2. Analyze Logs: If you need to understand the details of the planning run, you can analyze the logs generated during the planning process. This can provide insights into what was planned and any potential issues that may have been encountered.

    3. Check Settings: If you are not satisfied with the results, review the planning parameters and settings in the system. Ensure that the master data, such as material master records, production versions, and resource capacities, are correctly configured.

    4. Run Additional Planning: If necessary, you can run additional planning processes, such as heuristic planning or detailed scheduling, to refine the results further.

    5. Consult Documentation: Refer to SAP documentation or help resources for more detailed information on regenerative planning and how it interacts with your specific configuration.

    Related Information:

    • Regenerative Planning: This is a planning method where the entire planning horizon is recalculated from scratch. It is typically used when significant changes have occurred in demand, supply, or other planning parameters.
    • APO/IBP: SAP Advanced Planning and Optimization (APO) and SAP Integrated Business Planning (IBP) are tools used for supply chain planning, including demand planning, supply network planning, and production planning.
    • Error Messages: Familiarize yourself with other related error messages in SAP that may indicate issues during planning runs, such as capacity constraints or material shortages.

    If you encounter any specific issues or unexpected results after the planning run, it may be helpful to consult with your SAP support team or refer to SAP community forums for additional assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant