Message type: E = Error
Message class: PPC1VA - Messages for Variance Dialog for DI Backflush
Message number: 023
Message text: No check was performed
No changes have been made to the data since the last check. No new
checks are therefore necessary.
No checks were performed.
If all lines are without errors (green traffic light), no checks are
necessary. If there are lines with errors (red traffic light), correct
the errors and have the system check the data again.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
PPC1VA023
- No check was performed ?The SAP error message PPC1VA023 ("No check was performed") typically occurs in the context of the SAP Production Planning (PP) module, particularly when dealing with capacity planning or production scheduling. This message indicates that the system did not perform a check for the specified operation or resource, which can be due to various reasons.
Causes:
- Missing Configuration: The relevant configuration for capacity planning or scheduling may not be set up correctly. This could include missing parameters in the work center or routing.
- Resource Availability: The system may not have the necessary data to perform the check, such as resource availability or capacity data.
- Incorrect Master Data: Issues with master data, such as incorrect or incomplete work center or routing definitions, can lead to this error.
- Planning Parameters: The planning parameters may not be set correctly, leading to the system skipping checks.
- System Settings: Certain system settings or user authorizations may prevent the execution of checks.
Solutions:
- Check Configuration: Review the configuration settings for the relevant work centers and routing. Ensure that all necessary parameters are correctly defined.
- Verify Master Data: Ensure that the master data for work centers, production resources, and routing is complete and accurate.
- Review Planning Parameters: Check the planning parameters in the configuration to ensure they are set correctly for the type of planning you are performing.
- Run Capacity Check: If applicable, manually run a capacity check to see if the system can perform the check under different conditions.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance related to the error message and the context in which it occurs.
- Check User Authorizations: Ensure that the user has the necessary authorizations to perform the checks in the system.
Related Information:
CO01
(Create Production Order), CO02
(Change Production Order), and CM01
(Capacity Planning) to navigate through the system effectively.If the problem persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth analysis and assistance.
Get instant SAP help. Start your 7-day free trial now.
PPC1VA022
Variances were posted successfully
What causes this issue? The variances with a green traffic light were posted. The variances with a red traffic light were not posted. They are still ...
PPC1VA021
Enter a unit of measure
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPC1VA024
Data was checked
What causes this issue? The new data entered and/or data changed was checked.System Response The system uses a traffic light to show the status of t...
PPC1VA025
Enter a storage location
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...