Message type: E = Error
Message class: PPC1VA - Messages for Variance Dialog for DI Backflush
Message number: 014
Message text: No controlling data exists for resource &1
No controlling data has been maintained for resource &V1&.
The system cannot post any production activities.
Maintain controlling data in iPPE for the resource &V1& or enter a
different resource.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
PPC1VA014
- No controlling data exists for resource &1 ?The SAP error message PPC1VA014 indicates that there is no controlling data available for the specified resource (denoted as
&1
). This error typically occurs in the context of production planning and control, particularly when trying to execute operations that require resource-related data, such as capacity planning or scheduling.Cause
The error can be caused by several factors, including:
- Missing Master Data: The resource (work center, machine, etc.) may not have been properly set up in the system, or the controlling data (such as cost center, activity type, etc.) is missing.
- Incorrect Configuration: The configuration settings for the resource may not be correctly defined, leading to a lack of controlling data.
- Data Inconsistencies: There may be inconsistencies in the data related to the resource, such as missing links between the resource and its controlling area.
- Inactive Resource: The resource may be inactive or not available for the period in question.
Solution
To resolve the error, you can take the following steps:
Check Resource Master Data:
- Go to the resource (work center) in the SAP system and verify that all necessary master data is correctly maintained.
- Ensure that the controlling data (cost center, activity types, etc.) is assigned to the resource.
Verify Configuration:
- Check the configuration settings for the resource in the relevant customizing transactions (e.g., SPRO).
- Ensure that the resource is correctly linked to the appropriate controlling area.
Review Activity Types:
- Ensure that the activity types associated with the resource are correctly defined and active.
Check Validity Period:
- Verify that the resource is active for the period you are trying to use it. If the resource is inactive for that period, you may need to reactivate it.
Consult Documentation:
- Review SAP documentation or help resources for any specific requirements related to the resource type you are working with.
Contact Support:
- If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting SAP Notes for any known issues related to this error.
Related Information
CR01
(Create Work Center), CR02
(Change Work Center), or KP26
(Change Activity Type Planning) to manage resource data.By following these steps, you should be able to identify and resolve the issue causing the PPC1VA014 error in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
PPC1VA013
Enter an activity
What causes this issue? To determine/check the mode, it is necessary to enter an activity and a class with class type among other things.System Respo...
PPC1VA012
Variances entered successfully
What causes this issue? The posting of the variances has been triggered successfully.System Response The system issues an error message and will not...
PPC1VA015
Enter a quantity
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPC1VA016
At least one error occurred during the entry of the backflush data
What causes this issue? At least one error has occurred during the check of the backflush data entered.System Response The system has marked the inc...