Do you have any question about this error?
Message type: E = Error
Message class: PPC1PR - Abarbeitung der ERP-Prozesse
Message number: 400
Message text: Plant: &1, Date: &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PPC1PR400
- Plant: &1, Date: &2 ?The SAP error message PPC1PR400 typically relates to issues in the Production Planning (PP) module, specifically concerning the planning of production orders or capacity planning. The message indicates that there is a problem with the plant and date specified in the error message.
Cause:
The error message PPC1PR400 can be triggered by several factors, including:
- Invalid Plant or Date: The plant or date specified in the production planning process may not be valid or may not exist in the system.
- Capacity Issues: There may be capacity constraints or issues with the resources (work centers) in the specified plant for the given date.
- Master Data Issues: There could be missing or incorrect master data related to the plant, such as material master, work center, or routing.
- Planning Parameters: Incorrect planning parameters or settings in the configuration for the plant may lead to this error.
Solution:
To resolve the PPC1PR400 error, you can take the following steps:
- Check Plant and Date: Verify that the plant and date specified in the error message are correct and exist in the system.
- Review Capacity: Check the capacity of the work centers in the specified plant for the given date. Ensure that there are no capacity overloads or constraints.
- Validate Master Data: Ensure that all relevant master data (material master, work center, routing) is correctly set up and maintained for the plant.
- Check Planning Parameters: Review the planning parameters and settings in the configuration for the plant to ensure they are correctly defined.
- Run Planning Again: After making the necessary corrections, try running the planning process again to see if the error persists.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant specializing in Production Planning.
Get instant SAP help. Start your 7-day free trial now.
PPC1PR302
Make at least one entry for error selection
What causes this issue? If using the current selection criteria, the system would not select any logs.System Response The system issues an error mes...
PPC1PR301
&1 logs selected: display of &2 most recent logs
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPC1PR503
Server group &1 does not exist
What causes this issue? The server group that you have selected does not exist.System Response The system issues an error message and will not allow...
PPC1PR504
System error. To analyze the error, check the system log
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.