How To Fix PPC1PR400 - Plant: &1, Date: &2


PPC1PR400 - Overview

  • Message type: E = Error

  • Message class: PPC1PR - Abarbeitung der ERP-Prozesse

  • Message number: 400

  • Message text: Plant: &1, Date: &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


PPC1PR400 - Details

  • The SAP error message PPC1PR400 typically relates to issues in the Production Planning (PP) module, specifically concerning the planning of production orders or capacity planning. The message indicates that there is a problem with the plant and date specified in the error message.
    
    Cause: The error message PPC1PR400 can be triggered by several factors, including: Invalid Plant or Date: The plant or date specified in the production planning process may not be valid or may not exist in the system. Capacity Issues: There may be capacity constraints or issues with the resources (work centers) in the specified plant for the given date. Master Data Issues: There could be missing or incorrect master data related to the plant, such as material master, work center, or routing. Planning Parameters: Incorrect planning parameters or settings in the configuration for the plant may lead to this error.
    Solution: To resolve the PPC1PR400 error, you can take the following steps: Check Plant and Date:

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


PPC1PR400 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant