How To Fix PPC0308 - Up to now only &1 &2 confirmed for MAP previous reporting points


PPC0308 - Overview

  • Message type: E = Error

  • Message class: PPC0 - Messages for PP Confirmation

  • Message number: 308

  • Message text: Up to now only &1 &2 confirmed for MAP previous reporting points

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


PPC0308 - Details

  • The SAP error message PPC0308 typically occurs in the context of Production Planning and Control (PP) when dealing with the confirmation of production orders or operations. This specific error indicates that there are discrepancies in the confirmation of reporting points for a manufacturing process.
    
    Cause: The error message PPC0308 "Up to now only &1 &2 confirmed for MAP previous reporting points" usually arises due to one of the following reasons: Incomplete Confirmation: The system has detected that not all required reporting points for a particular operation have been confirmed. This can happen if the user has only confirmed a subset of the reporting points. Incorrect Sequence of Confirmations: If the confirmations are not done in the correct order or if there are missing confirmations for previous reporting points, this error can occur.
    Configuration Issues: There may be issues with the configuration of the routing or the production order that affect how confirmations are processed.
    Solution: To resolve

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


PPC0308 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author