Do you have any question about this error?
Message type: E = Error
Message class: PPC0 - Messages for PP Confirmation
Message number: 219
Message text: Enter a mode number
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PPC0219
- Enter a mode number ?The SAP error message PPC0219, which states "Enter a mode number," typically occurs in the context of production planning or capacity planning within the SAP system. This error indicates that the system requires a mode number to proceed with a specific operation, but it has not been provided.
Cause:
- Missing Input: The user has not entered a mode number in the relevant field. Mode numbers are often used to define different production modes or scenarios (e.g., different shifts, production methods, etc.).
- Configuration Issues: There may be a configuration issue in the production planning settings that does not allow the system to recognize or default a mode number.
- User Error: The user may have overlooked the requirement to enter a mode number or may not be aware of the necessary input.
Solution:
- Enter a Mode Number: The most straightforward solution is to enter a valid mode number in the required field. Check the documentation or consult with your team to determine the appropriate mode number to use.
- Check Configuration: If you believe you should not be receiving this error, check the configuration settings in the production planning module to ensure that mode numbers are set up correctly.
- Consult Documentation: Review the SAP documentation or help files related to the specific transaction or process you are working on to understand the context in which a mode number is required.
- User Training: If this error is common among users, consider providing training or guidance on the importance of entering a mode number and how to find the correct one.
Related Information:
By addressing the missing mode number and ensuring proper configuration and user training, you should be able to resolve the PPC0219 error effectively.
Get instant SAP help. Start your 7-day free trial now.
PPC0218
Enter an activity
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPC0217
Enter a resource
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPC0220
Enter a quantity
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPC0221
Enter a unit of measure
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.