Do you have any question about this error?
Message type: E = Error
Message class: PPC0 - Messages for PP Confirmation
Message number: 049
Message text: Reporting point &1 cannot be confirmed in order &2
The recording point &V1& for the order &V2& has been recognised as
inactive, due to configuration or the definition of the temporal
validity.
The confirmation for the order cannot take place at this reporting point
.
Check the master data for the order.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
PPC0049
- Reporting point &1 cannot be confirmed in order &2 ?The SAP error message PPC0049, which states "Reporting point &1 cannot be confirmed in order &2," typically occurs in the context of production planning and control, particularly when dealing with production orders and reporting points in the manufacturing process.
Cause:
This error can arise due to several reasons, including:
- Incorrect Reporting Point: The reporting point specified in the confirmation does not exist or is not valid for the given production order.
- Order Status: The production order may be in a status that does not allow confirmations (e.g., it might be closed or technically completed).
- Missing Data: Required data for the reporting point or the production order may be missing or incorrectly configured.
- Sequence of Operations: The reporting point may not be in the correct sequence of operations for the production order.
- Authorization Issues: The user may not have the necessary authorizations to confirm the reporting point for the specified order.
Solution:
To resolve the PPC0049 error, you can take the following steps:
- Check Reporting Point: Verify that the reporting point specified in the confirmation exists and is valid for the production order in question.
- Review Order Status: Check the status of the production order. If it is closed or completed, you may need to reopen it or create a new order for further confirmations.
- Validate Data: Ensure that all necessary data related to the reporting point and production order is correctly maintained in the system.
- Sequence Check: Confirm that the reporting point is in the correct sequence of operations for the production order. If not, adjust the sequence or confirm the previous steps.
- Authorization Check: Ensure that the user attempting to confirm the reporting point has the necessary authorizations to perform this action.
- Consult Documentation: Refer to SAP documentation or help resources for specific details related to the configuration of reporting points and production orders.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant for further investigation.
Get instant SAP help. Start your 7-day free trial now.
PPC0048
Mode cannot be changed, &1 already confirmed
What causes this issue? Reporting point &V1& has been confirmed and the active mode has been determined. It is therefore not possible to chan...
PPC0047
Mode cannot be changed
What causes this issue? The order has already been processed with a different session. It is not possible to change the session.System Response The ...
PPC0050
The assignment of goods movements to reporting points is not unique
What causes this issue? Reporting point &V1& has not been allocated the attribute "Components confirmation" by its reporting point ...
PPC0051
A quantity has already been created for reporting point &1 of order &2
What causes this issue? A quantity has already been confirmed for reporting point &V1& of order &V2&.System Response The action cann...
Click on this link to search all SAP messages.