Message type: E = Error
Message class: PPC0 - Messages for PP Confirmation
Message number: 049
Message text: Reporting point &1 cannot be confirmed in order &2
The recording point &V1& for the order &V2& has been recognised as
inactive, due to configuration or the definition of the temporal
validity.
The confirmation for the order cannot take place at this reporting point
.
Check the master data for the order.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
The SAP error message PPC0049, which states "Reporting point &1 cannot be confirmed in order &2," typically occurs in the context of production planning and control, particularly when dealing with production orders and reporting points in the manufacturing process.
Cause: This error can arise due to several reasons, including: Incorrect Reporting Point: The reporting point specified in the confirmation does not exist or is not valid for the given production order. Order Status: The production order may be in a status that does not allow confirmations (e.g., it might be closed or technically completed). Missing Data: Required data for the reporting point or the production order may be missing or incorrectly configured. Sequence of Operations: The reporting point may not be in the correct sequence of operations for the production order. Authorization Issues: The user may not have the necessary authorizations to confirm the reporting point for the specified order.
Solution: To resolve the PPC0049 error, you can take
Get instant SAP help. Sign up for our Free Essentials Plan.
PPC0048
Mode cannot be changed, &1 already confirmed
What causes this issue? Reporting point &V1& has been confirmed and the active mode has been determined. It is therefore not possible to chan...
PPC0047
Mode cannot be changed
What causes this issue? The order has already been processed with a different session. It is not possible to change the session.System Response The ...
PPC0050
The assignment of goods movements to reporting points is not unique
What causes this issue? Reporting point &V1& has not been allocated the attribute "Components confirmation" by its reporting point ...
PPC0051
A quantity has already been created for reporting point &1 of order &2
What causes this issue? A quantity has already been confirmed for reporting point &V1& of order &V2&.System Response The action cann...
Click on this link to search all SAP messages.