How To Fix PPC0043 - Production activities are determined again


PPC0043 - Overview

  • Message type: E = Error

  • Message class: PPC0 - Messages for PP Confirmation

  • Message number: 043

  • Message text: Production activities are determined again

  • Show details Hide details
  • What causes this issue?

    The <ZK>Production Activities</> screen has been accessed before. The
    production activities are determined again because of subsequent changes
    to quantities (quantity, unit of measure or cancellation indicator) or
    because of changes to key information for the reporting points to be
    confirmed. Changes that were made to production activities before and
    unplanned production activities are lost.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Check the production activities again and, if necessary, change or add
    data for the production activities before saving the confirmation.

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPC0043 - Production activities are determined again ?
    The SAP error message PPC0043, which states "Production activities are determined again," typically occurs in the context of production planning and control within the SAP system. This message indicates that the system is attempting to re-determine production activities for a particular production order or process, which can happen for various reasons.
    Causes:
    
    Changes in Master Data: If there have been changes to the material master, routing, or bill of materials (BOM) after the production order was created, the system may need to re-evaluate the production activities.
    Order Modifications: If the production order has been modified (e.g., changes in quantities, dates, or components), the system may trigger a re-evaluation of the production activities.
    Scheduling Changes: Adjustments in scheduling parameters or changes in the production environment (like machine availability) can lead to this message.
    Capacity Planning: If there are changes in capacity planning or resource availability, the system may need to re-determine the production activities to align

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker