Message type: E = Error
Message class: PPC0 - Messages for PP Confirmation
Message number: 043
Message text: Production activities are determined again
The <ZK>Production Activities</> screen has been accessed before. The
production activities are determined again because of subsequent changes
to quantities (quantity, unit of measure or cancellation indicator) or
because of changes to key information for the reporting points to be
confirmed. Changes that were made to production activities before and
unplanned production activities are lost.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Check the production activities again and, if necessary, change or add
data for the production activities before saving the confirmation.
Error message extract from SAP system. Copyright SAP SE.
PPC0043
- Production activities are determined again ?The SAP error message PPC0043, which states "Production activities are determined again," typically occurs in the context of production planning and control within the SAP system. This message indicates that the system is attempting to re-determine production activities for a particular production order or process, which can happen for various reasons. Causes: Changes in Master Data: If there have been changes to the material master, routing, or bill of materials (BOM) after the production order was created, the system may need to re-evaluate the production activities. Order Modifications: If the production order has been modified (e.g., changes in quantities, dates, or components), the system may trigger a re-evaluation of the production activities. Scheduling Changes: Adjustments in scheduling parameters or changes in the production environment (like machine availability) can lead to this message. Capacity Planning: If there are changes in capacity planning or resource availability, the system may need to re-determine the production activities to align
Get instant SAP help. Sign up for our Free Essentials Plan.
PPC0042
Goods movements are determined again
What causes this issue? The <ZK>Goods Movements</> screen has been accessed before. Materials for the goods issue and goods receipt are d...
PPC0041
Settings exist already: variances cannot be determined
What causes this issue? Settings have been made for the determination of the goods movements and activities for the matrix order that you want to con...
PPC0044
Goods movements and production activities are determined again
What causes this issue? The <ZK>Goods Movements</> and <ZK>Production Activities </> screens have been accessed before. The g...
PPC0045
Could not determine the corresponding iPPE data
What causes this issue? The <DS:GLOS.58AA54E777E8D311AB320060B03C3B0B>line network</> or <DS:GLOS.2B7ECF5DDBE9D311B1310060B03C6BFB>...
Click on this link to search all SAP messages.