Do you have any question about this error?
Message type: E = Error
Message class: PPC0 - Messages for PP Confirmation
Message number: 016
Message text: Date &1 with time &2 is in the future
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PPC0016
- Date &1 with time &2 is in the future ?The SAP error message PPC0016, which states "Date &1 with time &2 is in the future," typically occurs in the context of planning or scheduling activities within SAP, particularly in modules like Production Planning (PP) or Project System (PS). This error indicates that the system has encountered a date and time that is set in the future, which is not acceptable for the operation being performed.
Cause:
- Future Date Entry: The user has entered a date and time that is beyond the current system date and time.
- System Configuration: The system may have specific settings that restrict operations to only allow dates and times that are equal to or earlier than the current date and time.
- Data Entry Error: There may have been a mistake in entering the date and time, such as a typographical error or misunderstanding of the required format.
Solution:
- Check Date and Time: Review the date and time entered in the transaction. Ensure that it is not set in the future. If it is, adjust it to a valid date and time that is equal to or earlier than the current date and time.
- System Date Verification: Verify the system date and time settings. Ensure that the server or system time is correctly set and synchronized with the actual current time.
- Review Configuration: If the issue persists, check the configuration settings in the relevant SAP module to see if there are any restrictions on date and time entries.
- User Training: If users frequently encounter this error, consider providing training or guidelines on how to correctly enter dates and times in the system.
Related Information:
If the problem continues after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant for further investigation.
Get instant SAP help. Start your 7-day free trial now.
PPC0015
Date &1 is in the future
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPC0014
Confirmed start time after confirmed finish time
What causes this issue? The confirmed start time &V1& &V2& falls after the confirmed finish time &V3& &V4&.System Res...
PPC0017
Posting date is in the future
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPC0018
Input help for cause cannot be used without a location
What causes this issue? You want to use the input help for the cause field. You cannot use the input help, however, unless you enter the location of ...
Click on this link to search all SAP messages.