How To Fix PP_SCH_PRODN052 - Order &1 has been rescheduled to the next available slot on &2.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PP_SCH_PRODN -

  • Message number: 052

  • Message text: Order &1 has been rescheduled to the next available slot on &2.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PP_SCH_PRODN052 - Order &1 has been rescheduled to the next available slot on &2. ?

    The SAP error message PP_SCH_PRODN052 indicates that a production order has been rescheduled to the next available slot due to scheduling conflicts or resource constraints. This typically occurs in the Production Planning (PP) module when the system cannot find an available capacity to execute the order at the originally planned time.

    Causes:

    1. Resource Constraints: The work center or machine required for the production order is not available at the scheduled time due to maintenance, breakdowns, or other orders taking precedence.
    2. Capacity Overload: The total capacity required for all orders exceeds the available capacity of the work center.
    3. Material Availability: Lack of necessary materials can lead to rescheduling if the order cannot be executed without them.
    4. Scheduling Parameters: Incorrect settings in the scheduling parameters, such as lead times or setup times, can lead to conflicts.
    5. Order Prioritization: Higher-priority orders may push lower-priority orders to later dates.

    Solutions:

    1. Check Resource Availability: Review the availability of the work center or machine. Ensure that it is not overloaded and that it is available for the scheduled time.
    2. Adjust Production Schedule: If possible, adjust the production schedule to better align with available capacity. This may involve rescheduling other orders or changing priorities.
    3. Review Material Availability: Ensure that all necessary materials are available for the production order. If materials are missing, expedite their procurement.
    4. Modify Scheduling Parameters: Check and adjust the scheduling parameters in the production order or work center settings to ensure they are set correctly.
    5. Capacity Planning: Use capacity planning tools in SAP to analyze and optimize resource allocation and avoid overload situations.
    6. Consult with Production Planners: Work with production planners to understand the scheduling conflicts and find a resolution that minimizes disruption.

    Related Information:

    • Transaction Codes: You can use transaction codes like CO02 (Change Production Order) to view and modify the order details, or CM01 (Capacity Planning) to analyze capacity issues.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to scheduling and capacity management.
    • Documentation: Review SAP documentation on production scheduling and capacity planning for best practices and guidelines.

    By addressing the underlying causes and implementing the suggested solutions, you can resolve the PP_SCH_PRODN052 error and ensure smoother production scheduling.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author