Do you have any question about this error?
Message type: E = Error
Message class: PP_SCH_PRODN -
Message number: 001
Message text: Order &1 Operation &2 is rescheduled to be dispatched from &3 to &4.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PP_SCH_PRODN001
- Order &1 Operation &2 is rescheduled to be dispatched from &3 to &4. ?The SAP error message PP_SCH_PRODN001 indicates that a production order operation has been rescheduled for dispatch. This typically occurs in the context of production planning and scheduling within the SAP system. The message provides specific details about the order number, operation number, and the original and new dispatch dates.
Cause:
The error can be caused by several factors, including:
- Capacity Constraints: The resources (machines, labor) required for the operation may not be available at the originally scheduled time due to capacity issues.
- Material Availability: The necessary materials for the operation may not be available, leading to a delay in the production schedule.
- Changes in Production Planning: Adjustments in the production plan, such as changes in priorities or the introduction of new orders, can lead to rescheduling.
- External Factors: Unforeseen circumstances such as machine breakdowns, maintenance, or supply chain disruptions can also cause rescheduling.
Solution:
To resolve the issue, consider the following steps:
- Check Resource Availability: Review the capacity of the resources involved in the operation. Ensure that the necessary machines and labor are available for the new dispatch date.
- Review Material Availability: Confirm that all required materials are available for the operation. If materials are missing, coordinate with the procurement team to expedite their delivery.
- Adjust Production Schedule: If the rescheduling is due to changes in priorities, adjust the production schedule accordingly. Use the production planning tools in SAP to optimize the schedule.
- Analyze the Impact: Assess how the rescheduling affects other operations and orders. Make necessary adjustments to minimize disruptions in the production process.
- Communicate with Stakeholders: Inform relevant stakeholders (production team, supply chain, etc.) about the changes to ensure everyone is aligned with the new schedule.
Related Information:
CO02
(Change Production Order) or MD04
(Stock/Requirements List) to analyze and manage production orders.By following these steps, you should be able to address the rescheduling issue effectively and minimize its impact on your production operations.
Get instant SAP help. Start your 7-day free trial now.
PP_SCH_PRODN000
Dispatch of Order &1 Operation &2 scheduled from &3 to &4 was successful.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PP_PRODORD_CNF_ODATA033
Variant &1 does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PP_SCH_PRODN002
Order &1 is not dispatched.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PP_SCH_PRODN003
Order &1 Operation &2 is deallocated successfully.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.