How To Fix PP_PRODORD_CNF_ODATA008 - Enter a valid interval for the scheduled start date


PP_PRODORD_CNF_ODATA008 - Overview

  • Message type: E = Error

  • Message class: PP_PRODORD_CNF_ODATA - PP_PRODORD_CNF_ODATA

  • Message number: 008

  • Message text: Enter a valid interval for the scheduled start date

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


PP_PRODORD_CNF_ODATA008 - Details

  • The SAP error message PP_PRODORD_CNF_ODATA008 indicates that there is an issue with the scheduled start date for a production order. This error typically arises when the date entered does not fall within a valid range or interval defined by the system.
    
    Cause: Invalid Date Range: The scheduled start date you are trying to enter may be outside the permissible range set in the system. This could be due to: The date being in the past. The date being too far in the future. The date not aligning with the production calendar or working days.
    Configuration Issues: There may be configuration settings in the production planning module that restrict the dates that can be entered. User Input Error: The date may have been entered incorrectly, such as a typo or incorrect format.
    Solution: Check Date Validity: Ensure that the scheduled start date you are entering is valid. It should be: Within the current date and the defined future date limits. Aligned with

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


PP_PRODORD_CNF_ODATA008 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker