How To Fix PP_PRODOPS_CNF_ODATA019 - Only operations scheduled to start latest today are selected


PP_PRODOPS_CNF_ODATA019 - Overview

  • Message type: E = Error

  • Message class: PP_PRODOPS_CNF_ODATA - Fiori Wave 2: Backend services for Operation Confirmations

  • Message number: 019

  • Message text: Only operations scheduled to start latest today are selected

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


PP_PRODOPS_CNF_ODATA019 - Details

  • The SAP error message PP_PRODOPS_CNF_ODATA019 indicates that only operations scheduled to start on or before the current date are being selected for processing. This error typically arises in the context of production planning and scheduling within the SAP system, particularly when working with production orders and operations.
    
    Cause: Date Constraints: The error is primarily caused by the system's filtering criteria, which restricts the selection of operations to those that are scheduled to start on or before the current date. If you are trying to process operations that are scheduled to start in the future, they will not be included in the selection. Configuration Settings: There may be specific settings in the production planning configuration that enforce this behavior, such as the scheduling parameters or the way the production order is set up. Data Entry Errors: Incorrect dates or scheduling information in the production order or operations can also lead to this error.
    Solution: Check Operation Dates:

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


PP_PRODOPS_CNF_ODATA019 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant