How To Fix PP_ODATA_API_WKC001 - Scheduling capacity is not maintained for the workcenter


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PP_ODATA_API_WKC - Message class for ODATA_PP_WORKCENTER_API

  • Message number: 001

  • Message text: Scheduling capacity is not maintained for the workcenter

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PP_ODATA_API_WKC001 - Scheduling capacity is not maintained for the workcenter ?

    The SAP error message PP_ODATA_API_WKC001 indicates that scheduling capacity is not maintained for a specific work center. This error typically arises when trying to perform operations related to production planning or scheduling, and the system cannot find the necessary capacity data for the specified work center.

    Cause:

    1. Missing Capacity Data: The work center in question does not have any capacity data defined. This could be due to the work center not being properly configured or the capacity not being maintained in the system.
    2. Incorrect Work Center Assignment: The work center may not be correctly assigned to the relevant production order or routing.
    3. Inactive Work Center: The work center might be inactive or not available for scheduling.
    4. Configuration Issues: There may be issues with the configuration of the work center or the related production planning settings.

    Solution:

    1. Check Work Center Configuration:

      • Go to the transaction code CR01 (Create Work Center) or CR02 (Change Work Center) and verify that the work center is correctly configured.
      • Ensure that the capacity data (e.g., available capacity, capacity categories) is maintained for the work center.
    2. Maintain Capacity:

      • If capacity data is missing, you can maintain it by navigating to the capacity planning view of the work center and entering the required capacity details.
    3. Verify Work Center Status:

      • Ensure that the work center is active and available for scheduling. You can check this in the work center configuration.
    4. Check Assignment:

      • Ensure that the work center is correctly assigned to the relevant routing or production order. You can check this in the routing or production order details.
    5. Consult Documentation:

      • Review SAP documentation or help resources for any specific requirements or configurations related to work centers and capacity planning.
    6. Testing:

      • After making the necessary changes, test the scheduling process again to see if the error persists.

    Related Information:

    • Transaction Codes:
      • CR01: Create Work Center
      • CR02: Change Work Center
      • CR03: Display Work Center
      • CO01: Create Production Order
      • CO02: Change Production Order
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional troubleshooting steps.
    • Capacity Planning: Familiarize yourself with the concepts of capacity planning in SAP, including how to define and manage work center capacities.

    If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning and control.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker