How To Fix PP_KAB_ODATA_API_KCC020 - Replenishment strategy not valid or missing


PP_KAB_ODATA_API_KCC020 - Overview

  • Message type: E = Error

  • Message class: PP_KAB_ODATA_API_KCC - Messages for Kanban Control Cycle OData API

  • Message number: 020

  • Message text: Replenishment strategy not valid or missing

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PP_KAB_ODATA_API_KCC020 - Replenishment strategy not valid or missing ?
    The SAP error message PP_KAB_ODATA_API_KCC020 indicates that there is an issue with the replenishment strategy in the context of the OData API for production planning (PP). This error typically arises when the system cannot find a valid replenishment strategy for a particular material or product.
    
    Cause: Missing Replenishment Strategy: The material in question does not have a replenishment strategy assigned in the material master data. Invalid Replenishment Strategy: The replenishment strategy assigned is not valid or has been deactivated.
    Configuration Issues: There may be issues with the configuration settings in the system that prevent the replenishment strategy from being recognized. Data Inconsistencies: There could be inconsistencies in the data related to the material or the planning parameters.
    Solution: Check Material Master Data: Go to the material master record (transaction code MM03) and check the relevant views (e.g., MRP view) to ensure that a valid replenishment strategy is assigned. If it is missing, you may need to assign a valid

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant