Do you have any question about this error?
Message type: E = Error
Message class: PORD_MESSAGES - Message class for PORD services
Message number: 074
Message text: For TypeCode 3 Planned start date and Planned end date are mandatory.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PORD_MESSAGES074
- For TypeCode 3 Planned start date and Planned end date are mandatory. ?The SAP error message PORD_MESSAGES074 indicates that for a specific type of order (TypeCode 3), both the Planned Start Date and Planned End Date are mandatory fields that must be filled in before the order can be processed. This error typically occurs in the context of production orders, maintenance orders, or similar processes where scheduling is essential.
Cause:
The error arises when you attempt to create or modify an order without providing the required dates. The system requires these dates to plan and schedule the order effectively. If either of these fields is left blank or not properly populated, the system will trigger this error message.
Solution:
To resolve this error, you need to ensure that both the Planned Start Date and Planned End Date are filled in correctly. Here are the steps to do this:
Access the Order Creation/Modification Screen: Go to the transaction where you are creating or modifying the order (e.g., CO01 for production orders).
Locate the Date Fields: Find the fields for Planned Start Date and Planned End Date in the order details.
Enter the Dates:
- Planned Start Date: Enter the date when you intend to start the order.
- Planned End Date: Enter the date when you expect to complete the order.
Check Date Format: Ensure that the dates are in the correct format as per your system settings (e.g., DD/MM/YYYY or MM/DD/YYYY).
Save the Order: After entering the required information, save the order and check if the error persists.
Related Information:
By following these steps, you should be able to resolve the error and proceed with your order processing in SAP.
Get instant SAP help. Start your 7-day free trial now.
PORD_MESSAGES073
For TypeCode 2 Planenddate or Enddateoffsetduration is mandatory.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PORD_MESSAGES072
For TypeCode 1 Planstrtdate or Strtdateoffsetduration is mandatory.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PORD_MESSAGES075
For TypeCode 4 skip all the four parameters.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PORD_MESSAGES076
Error occured in the implementation of input mapping of the BAdi
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.