How To Fix PMRP106 - Decrease the value. Change in capacity is too big to be updated.


PMRP106 - Overview

  • Message type: E = Error

  • Message class: PMRP - Messages for pMRP

  • Message number: 106

  • Message text: Decrease the value. Change in capacity is too big to be updated.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PMRP106 - Decrease the value. Change in capacity is too big to be updated. ?
    The SAP error message PMRP106 ("Decrease the value. Change in capacity is too big to be updated.") typically occurs in the context of capacity planning and production planning within the SAP system, particularly when dealing with capacity evaluations or adjustments in the Production Planning (PP) or Plant Maintenance (PM) modules.
    
    Cause: This error message is triggered when an attempt is made to decrease the capacity of a work center or resource by a value that exceeds the allowable limit set in the system. The system has checks in place to prevent drastic changes that could lead to inconsistencies in planning and scheduling.
    Solution: To resolve this error, consider the following steps: Review Capacity Changes: Check the capacity change you are trying to make. Ensure that the decrease is within acceptable limits. If the change is too large, consider breaking it down into smaller increments. Adjust Capacity in Smaller Steps: Instead of making a large decrease in

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author