Do you have any question about this error?
Message type: E = Error
Message class: PMRP - Messages for pMRP
Message number: 088
Message text: Change to consider a resource overload has been redone
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PMRP088
- Change to consider a resource overload has been redone ?The SAP error message PMRP088, which states "Change to consider a resource overload has been redone," typically occurs in the context of production planning and scheduling within the SAP system. This message indicates that a change made to a production order or scheduling has been reverted due to a resource overload situation.
Cause:
Resource Overload: The primary cause of this error is that the system has detected that the planned workload on a resource (such as a machine or labor) exceeds its available capacity. This can happen if:
- The production order is scheduled for a time when the resource is already fully booked.
- There are conflicting orders or operations that require the same resource simultaneously.
- Changes made to the order (like rescheduling or adjusting quantities) lead to an overload situation.
Scheduling Conflicts: If multiple orders are scheduled to use the same resource at overlapping times, the system may not be able to accommodate all of them, leading to this error.
Capacity Planning Settings: Incorrect settings in capacity planning or resource allocation can also lead to this error.
Solution:
Review Resource Capacity: Check the capacity of the resource in question. Ensure that it has enough available capacity to handle the workload. You can do this by:
- Navigating to the capacity planning transaction (e.g., CM01, CM21) to view the load on the resource.
- Adjusting the capacity settings if necessary.
Reschedule Orders: If there are conflicting orders, consider rescheduling one or more of them to alleviate the overload. This can involve:
- Changing the start or finish dates of the production orders.
- Adjusting the quantities or operations assigned to the resource.
Adjust Production Orders: If the production order itself is causing the overload, you may need to:
- Split the order into smaller parts that can be handled within the available capacity.
- Change the routing or operations to utilize different resources if possible.
Check for Errors in Planning: Ensure that there are no errors in the planning data, such as incorrect lead times, setup times, or operation sequences that could be causing the overload.
Consult with Production Planning Team: If you are unable to resolve the issue, it may be beneficial to consult with your production planning or scheduling team for further insights and adjustments.
Related Information:
Transaction Codes: Familiarize yourself with relevant transaction codes such as:
SAP Notes: Check for any SAP Notes related to PMRP088 for additional guidance or patches that may address known issues.
Documentation: Review SAP documentation on production planning and capacity management for best practices and troubleshooting steps.
By following these steps, you should be able to identify the cause of the PMRP088 error and implement a solution to resolve the resource overload issue.
Get instant SAP help. Start your 7-day free trial now.
PMRP087
Change of simulation text has been redone
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PMRP086
Change of source of supply has been undone
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PMRP089
Simulated change of top-level demand has been redone
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PMRP090
Change to reference top-level demand has been redone
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.