How To Fix PMRP081 - Change to consider a resource overload has been undone


PMRP081 - Overview

  • Message type: E = Error

  • Message class: PMRP - Messages for pMRP

  • Message number: 081

  • Message text: Change to consider a resource overload has been undone

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PMRP081 - Change to consider a resource overload has been undone ?
    The SAP error message PMRP081 ("Change to consider a resource overload has been undone") typically occurs in the context of production planning and scheduling within the SAP system, particularly when dealing with capacity planning and resource allocation in the Production Planning (PP) module.
    
    Cause: This error message indicates that a change made to a production order or a scheduling operation has been reverted due to a resource overload situation. This can happen for several reasons, including: Resource Overload: The system detected that the planned workload exceeds the available capacity of a resource (e.g., machine, labor) for a given time period. Scheduling Conflicts: Changes made to the order or operation may conflict with existing schedules or capacity constraints. Manual Adjustments: If a user manually adjusts the scheduling or capacity settings, the system may revert those changes to maintain overall balance and avoid overloads. Capacity Planning Settings: Incorrect or suboptimal settings in the capacity planning configuration can lead

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant