How To Fix PMRP081 - Change to consider a resource overload has been undone


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PMRP - Messages for pMRP

  • Message number: 081

  • Message text: Change to consider a resource overload has been undone

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PMRP081 - Change to consider a resource overload has been undone ?

    The SAP error message PMRP081 ("Change to consider a resource overload has been undone") typically occurs in the context of production planning and scheduling within the SAP system, particularly when dealing with capacity planning and resource allocation in the Production Planning (PP) module.

    Cause:

    This error message indicates that a change made to a production order or a scheduling operation has been reverted due to a resource overload situation. This can happen for several reasons, including:

    1. Resource Overload: The system detected that the planned workload exceeds the available capacity of a resource (e.g., machine, labor) for a given time period.
    2. Scheduling Conflicts: Changes made to the order or operation may conflict with existing schedules or capacity constraints.
    3. Manual Adjustments: If a user manually adjusts the scheduling or capacity settings, the system may revert those changes to maintain overall balance and avoid overloads.
    4. Capacity Planning Settings: Incorrect or suboptimal settings in the capacity planning configuration can lead to this error.

    Solution:

    To resolve the PMRP081 error, consider the following steps:

    1. Check Resource Availability: Review the capacity of the resources involved in the production order. Ensure that the available capacity is sufficient to handle the planned workload.
    2. Adjust Production Orders: If necessary, adjust the production orders or operations to spread the workload more evenly across available resources. This may involve rescheduling or changing the sequence of operations.
    3. Review Capacity Planning Settings: Ensure that the capacity planning settings in the system are correctly configured. This includes checking the work center settings, available capacity, and any relevant planning parameters.
    4. Use Alternative Resources: If possible, consider using alternative resources that may have available capacity to handle the workload.
    5. Analyze Load and Capacity Reports: Utilize SAP reports to analyze load and capacity to identify bottlenecks or overload situations. Reports such as the Capacity Evaluation (CM01) can be helpful.
    6. Consult Documentation: Refer to SAP documentation or help resources for specific guidance on handling capacity issues and the PMRP081 error.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CO02 (Change Production Order), CM01 (Capacity Planning), and CM21 (Capacity Leveling).
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • User Forums: Engage with SAP community forums or user groups for additional insights and solutions from other users who may have encountered similar issues.

    By following these steps, you should be able to address the PMRP081 error and ensure that your production planning processes run smoothly.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker