Do you have any question about this error?
Message type: E = Error
Message class: PMRP - Messages for pMRP
Message number: 029
Message text: No top-level demand found for planning
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PMRP029
- No top-level demand found for planning ?The SAP error message PMRP029 "No top-level demand found for planning" typically occurs in the context of Material Requirements Planning (MRP) when the system is unable to find a top-level demand (such as a sales order, production order, or planned independent requirement) for the material being planned. This can happen for several reasons, and understanding the cause is essential for resolving the issue.
Causes:
- Missing Demand: There may be no sales orders, production orders, or planned independent requirements for the material in question.
- Incorrect Planning Parameters: The planning parameters for the material may not be set correctly, leading to the system not recognizing any demand.
- Material Status: The material might be set to a status that prevents it from being planned (e.g., "Blocked" or "Inactive").
- MRP Type: The MRP type assigned to the material may not be appropriate for the planning scenario (e.g., if it is set to "ND" - No MRP).
- Plant or Storage Location Issues: The material may not be assigned to the correct plant or storage location, or the plant may not have any demand.
- Planning Horizon: The planning horizon may not include the period for which demand exists.
Solutions:
- Check Demand: Verify if there are any sales orders, production orders, or planned independent requirements for the material. If not, create the necessary demand.
- Review Planning Parameters: Ensure that the planning parameters for the material are set correctly in the material master (transaction code MM02).
- Check Material Status: Confirm that the material is not blocked or inactive. You can check this in the material master data.
- Verify MRP Type: Ensure that the MRP type is appropriate for the material. If it is set to "ND," consider changing it to a type that allows planning (e.g., "PD" for MRP).
- Check Plant and Storage Location: Make sure the material is assigned to the correct plant and storage location and that these are active.
- Adjust Planning Horizon: If necessary, adjust the planning horizon in the MRP settings to include the period for which demand exists.
Related Information:
By following these steps, you should be able to identify the cause of the PMRP029 error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
PMRP028
Top-level demand with ID &1 not found in simulation &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PMRP027
Simulation &1 does not have status 'In Creation'
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PMRP030
Simulation &1 cannot be used due to its status
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PMRP031
Quantity for top-level demand &1 must not be negative
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.